27.01.2015 Views

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

per 5 tones<br />

3. Water Bound<br />

Macadam<br />

(ii) Lime/Cement<br />

content<br />

(iii) Degree of<br />

pulverization<br />

(iv) CBR or Unconfined<br />

Compressive Strength<br />

test on a set of 3<br />

specimens<br />

(v) Moisture content<br />

prior<br />

to compaction<br />

(vi) Density of<br />

compacted<br />

layer<br />

(vii) Deleterious<br />

constituents<br />

(i) Aggregate Impact<br />

Value<br />

(ii) Grading<br />

(iii) Flakiness Index<br />

and Elongation Index<br />

(iv) Atterberg limits<br />

of binding material<br />

(v) Atterberg limits of<br />

portion of aggregate<br />

passing 425 micron<br />

sieve<br />

4. Wet Mix Macadam (i) Aggregate Impact<br />

Value<br />

(ii) Grading<br />

(iii) Flakiness and<br />

Elongation Index<br />

(iv) Atterberg limits of<br />

portion of aggregate<br />

passing 425 micron<br />

sieve<br />

(v)Density of compacted<br />

layer.<br />

Regularly, through<br />

procedural checks<br />

Periodically as<br />

considered necessary<br />

As required<br />

One lest per 250 sq. m.<br />

One test per 500 m 2<br />

As required<br />

One test per 200 m 3<br />

of aggregate<br />

One test per 100 m 3<br />

One test per 200 m 3<br />

of aggregate<br />

One test per 25 m 3<br />

of binding material<br />

One test per<br />

100 cubic meter<br />

of aggregate<br />

One test per 200 m 3<br />

of aggregate<br />

One test per 100m 3<br />

of aggregate<br />

One test per 200 m 3<br />

of aggregate<br />

One test per 100m 3<br />

of aggregate<br />

One test per 500 m 2<br />

903.4.1 Test and their frequency: - These shall be as specified in relevant clause of Section<br />

400.<br />

903.4.2 Acceptance Criteria thise shall be as specified in relevant clause of Section 400.<br />

903.5. Quality Control Tests for Concrete <strong>Road</strong> Construction: - As specified in relevant<br />

clause of Section 600 of concrete pavements<br />

903.5.1. Dry lean concrete sub-base: - As specified in relevant clause of Section 600 of<br />

concrete pavements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!