27.01.2015 Views

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(ii)The actual volume of the aggregates to be paid for shall be computed after deducting the<br />

specified percentages in Table 500-28, from the volume computed by stack measurements, to<br />

allow for bulking.<br />

(iii)Unless otherwise directed by the Engineer in charge, measurements shall not be taken until<br />

sufficient materials for use on the road have been collected and stacked. (iv)Immediately after<br />

measurement, the stacks shall be marked by white wash or other means as directed by the<br />

Engineer in charge. Stone filler as delivered to the site shall be measured in tonnes.<br />

TAKLE 500-28.<br />

PER CENT REDUCTION IN VOLUME OF AGGREGATES<br />

S. No. Standard size<br />

of aggregates<br />

Percentage reduction in volume<br />

computed by stack measurements to<br />

arrive at the volume to be paid for<br />

1. 75 mm and 63 mm 12.5<br />

2. 45 mm and 26.5 mm 10.0<br />

3. 22.4 mm, 13.2 mm, 11.2 mm and 6.7 mm 5.0<br />

4. Fine aggregate 5.0<br />

514.6. Rates<br />

The contract unit rates for different sizes of coarse aggregate, fine aggregate and stone filler shall<br />

be payment in full for collecting, conveying and stacking or storing at the site including full<br />

compensation for:<br />

(i) All royalties, fees, rents where necessary;<br />

(ii) All leads and lifts; and<br />

(iii)All labour, tools, equipment and incidentals to complete the work to the <strong>Specification</strong>s.<br />

(iv) All necessary testing of material, both initial, to approve the source, and regular control testing<br />

thereafter.<br />

515. MASTIC ASPHALT<br />

515.1. General<br />

(i)This work shall consist of constructing a single layer of mastic asphalt wearing course for road<br />

pavements and bridge decks.<br />

(ii)Mastic asphalt is an intimate homogeneous mixture of selected well graded aggregates, filler<br />

and bitumen in such proportions as to yield a plastic and void less mass, which when applied hot<br />

can be toweled and floated to form a very dense impermeable surfacing.<br />

515.2. Materials<br />

515.2.1. Binder:<br />

(i)Subject to the approval of the Engineer in charge, the binder shall be a paving grade bitumen<br />

meeting the requirements given in Table 500-29.<br />

515.2.2. Coarse aggregate:<br />

(i)The coarse aggregate shall consist of crushed stone, crushed gravel/shingle or other stones.<br />

(ii)They shall be clean, hard, durable, of fairly cubical shape, uncoated and free from soft, organic<br />

or other deleterious substances. They shall satisfy the physical.<br />

TABLE 500-29.<br />

REQUIREMENTS FOR PHYSICAL PROPERTIES OF BINDER<br />

Property Unit Test method Requirement<br />

Penetration at 25°C IS 1203 15 ±5*<br />

Softening point. °C IS 1205 65 ± 10<br />

Loss on heating for 5h<br />

at 163°C, % by mass<br />

Max IS 1212 2.0<br />

Solubility in<br />

trichloroethylene, %<br />

Min IS 1216 95<br />

by mass<br />

Ash (mineral matter),<br />

% by mass<br />

Max IS 1217 1.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!