27.01.2015 Views

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of all labour, material, tools and plant required, including preparation of surface and consolidation<br />

complete in all respects.<br />

The contract unit rate for each drainage spout shall include the cost of all labour, material, tools<br />

and plant required for completing the work as per these <strong>Specification</strong>s. It shall also include the cost of<br />

providing flow drain pipes with all fixtures upto the point of ground drains wherever shown on the<br />

drawings.<br />

The contract unit rate for weep hole shall include the cost of all labour, material, tools and plant<br />

required for completing the work as per these <strong>Specification</strong>s.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!