2414. RATE<br />

The contract unit rate shall include the cost of all labour, materials, tools and plant anequipment<br />

required for doing the boring or making pits as per these specifications, taking out and<br />

packing the samples, sending and getting them tested in approved laboratories and making available<br />

the test report as specified or directed by the Engineer inclusive of all incidental costs to complete the<br />

work as per the specifications.