704.5 Rates<br />

The contract unit rate for the accepted quantities of geotextile in place shall be per square. The rate is<br />

full compensation for furnishing, preparing, hauling, and placing materials including all labour, material,<br />

freight, tools, equipment, and incidentals to complete the work to these <strong>Specification</strong>s.<br />

705 GEOGRID APPLICATIONS FOR REINFORCED SOIL SLOPE PROTECTION<br />

705.1 Description: This work shall consist of constructing a reinforced soil slope in<br />

accordance with the contract documents and as directed by the Engineer. The Contractor shall provide<br />

all labour, equipment, and materials for and incidental to site preparation, furnishing, installing, and<br />

backfilling geogrid reinforcement as indicated.<br />

705.2 Material<br />

Geogrid reinforcement: The geogrid reinforcement for primary slope stabilization shall be uniaxially<br />

oriented grid structure. The geogrid reinforcement for secondary slope stabilization shall be a biaxially<br />

oriented grid structure. The manufacturer shall furnish the Engineer with test reports certifying that the<br />

product meets the requirements of these <strong>Specification</strong>s. Un-iaxail and bi-axaial geogrid shall be regular<br />

grid structure. The geogrid shall have high resistance to deformation under sustained long-term design<br />

load while in service and shall be resistant to ultraviolet degradation, damage under normal<br />

construction practices and all forms of biological or chemical degradation normally encountered in the<br />

material being reinforced. The long term allowable tensile strength shall have the minimum value of<br />

156.6 kN/m. The minimum pull-out resistance factor shall be 0.42 as determined by ASTM D 6706.<br />

Backfill: The contractor shall provide select granular backfill material as per contract.<br />

Facing: The contractor shall provide stone fill and geotextile as facing for the reinforced soil slope to<br />

the lines and grades shown on the plans.<br />

705.3 Installation<br />

All areas immediately beneath the installation area for the geogrid shall be properly prepared as<br />

detailed on the plans and as per these <strong>Specification</strong>s or as directed by the Engineer.<br />

The geogrid shall be installed in accordance with the manufacturere’s recommendation. The geogrid<br />

shall be placed within the layers of the compacted soil as shown on the plans or as directed by the<br />

Engineer. If the contractor is unable to complete a required length with a single continuous length of<br />

geogrid a joint may be made with the approval of the Engineer. After the specified layer has been<br />

placed in its entirety and compacted, the next geogrid layer shall be installed in its entirety. The process<br />

shall be repeated for such subsequent layer of geogrid and soil. Geogrid reinforcement shall be placed<br />

to lay flat and pulled tight prior to backfilling . After a layer of geogrid has been placed , suitable means,<br />

such as pins or small piles of soil shall be used to hold geogrid in position until the subsequent soil layer<br />

can be placed. Under no circumstances shall a track type vehicle be allowed on the geogrid before at<br />

least 150mm of soil has been placed.<br />

Backfill placement: Backfill shall be compacted as specified by project specifications or at least 95<br />

percent of the maximum density determined in accordance with IS:2726 (<strong>Part</strong>-8), whichever is greater.<br />

Backfill within 900 mm of slope face shall typically be compacted with hand equipment. Fill shall be<br />

placed in 200 mm maximum lift thickness.<br />

705.4 Measurement and basis of payment : The quantity of special provision to be<br />

measured for payment will the number of square meters of geogrid installed in the complete and<br />

accepted work.<br />

705.5 Rates<br />

The Contract unit rate will be full compensation for furnishing and installing the specified materials in<br />

accordance with the contract documents including on-site supplier representation, site preparation,<br />

geosynthetics reinforcement and backfill and for furnishing all labor, tools equipment and incidentals<br />

necessary to complete the work to these <strong>Specification</strong>.