501.8. Preparation of Surface<br />

501.8.1. General: This work shall consist of preparing an existing granular or black-topped<br />

surface bituminous course. The work shall be performed on such widths and lengths as shown on<br />

the approved drawings or as instructed by the Engineer in charge. The existing surface shall be<br />

firm and clean, and treated with Prime or Tack coat as shown on the drawings as otherwise<br />

stated in the Contract.<br />

501.8.2. Materials<br />

501.8.2.1. Scarifying the existing granular base course and re-laying the granular surface:<br />

The material used shall be coarse aggregate saved from the scarification of the existing granular<br />

base course supplemented by fresh coarse aggregate and screenings so that aggregates and<br />

screenings thus supplemented correspond to Clause 404: Water Bound Macadam or Clause 406:<br />

Wet Mix Macadam of the Ministry’s <strong>Specification</strong> for <strong>Road</strong> and <strong>Bridge</strong> <strong>Works</strong> (third revision) 1995.<br />

501.8.2.2. For patching potholes sealing cracks: Where the existing surface to be overlaid is<br />

bituminous, any existing potholes and cracks shall be repaired and sealed as stated below.<br />

(1)The existing bituminous surface should be inspected and all potholes and patch areas made<br />

free o any loose, defective material. The edges of all potholes shall be cut/trimmed with hand<br />

tools vertically to form rectangular shape and shall be thoroughly cleaned with wire brush,<br />

compressed air or other approved means, all dust and loose materials should be removed from<br />

site. Layers below the level of bituminous construction should be replaced using material of<br />

equivalent specification to the original construction and degree of compaction. The area of<br />

bituminous construction should be primed and / or tacked with an emulsion (meeting requirement<br />

of IS: 8887) depending on whether the lower area is granular or bituminous in nature. The sides<br />

of the excavated position should be painted with tack coat material using a hand brush/sprayer.<br />

(2)The bituminous patching material should be either a hot mix or a cold mix, adopting the<br />

reactive specification. The bituminous mixture, prepared in a plant of suitable capacity should be<br />

placed in layers of not more than 100 mm (loose) and compacted in layers with roller/plate<br />

compactor/ hand roller/ rammer to the desired compaction standard.<br />

(3) In the final layer the mix should be spread slightly proud of the surface so that after rolling, the<br />

surface shall be flush with the adjointing surface.<br />

(4) Where required, a seal coat should be applied as per the specified procedure. the surface<br />

levels should be checked using a 3m straight edge.<br />

Crack sealing:-<br />

(1) The fine cracks (less than 3 mm in width) should be sealed by for spray, which is a very light<br />

application of low viscosity slow setting emulsion. Prior to this treatment it is important that the<br />

surface is thoroughly cleaned, preferably with compressed air. The fog spray should be applied at<br />

a rate of 0.5-1.0 liter/m 2 of the specified emulsion. Using 0.5 -1.0 liter /m 2 of the specified<br />

emulsion, using an approved hand held sprayer.<br />

(2)The wide cracks (more than 3 mm in width) should be filled with crusher dust or other<br />

approved fine material passing 4.75 mm sieve to a level about 5 mm below the road surface<br />

level. After sweeping the surface clear of dust slow setting emulsion should be poured in the<br />

cracks, minimizing any spillage. If spillage does occur, crusher dust should be applied to bolt up<br />

the spillage. Isolated areas, with wide cracks, shall be cut and patched.<br />

501.8.2.3. For profile corrective course: A profile corrective course for correcting the existing<br />

pavement profile shall be laid to varying thickness as shown on the approved drawings. The<br />

profile corrective course shall be laid to tolerances and densities as specified for wearing course if<br />

a single layer, or base course, if it is to be covered with a wearing course layer.