5<br />

6<br />

All types of cracks with<br />

crack width below 6mm<br />

All types of cracks with<br />

crack width above 6mm<br />

coat<br />

2nd<br />

coat<br />

Single coat<br />

SAM<br />

as interlayer<br />

Single coat<br />

SAM<br />

as interlayer<br />

8 – 10<br />

8 – 10<br />

10 - 12<br />

0.103<br />

of 5. 6mm chips<br />

0. 10 m3<br />

of 5.6mm chips<br />

0.10m3<br />

of 11.2mm chips.<br />

7 Bitumen Impregnated<br />

Geotextile<br />

Note: 1 Binder quantities for bitumen impregnated geotextile shall be in the range 0.9 to 1.2<br />

Lures/nr. Binder quantities outside this range are permitted according to the geotextile<br />

manufacturer’s instructions and subject to the agreement of the Engineer in charge. Geotextile<br />

shall be applied according to Clause 502.4. The surface on which the binder is to be applied shall<br />

be dry.<br />

522.3.4. Application of aggregates:<br />

(i)The equipment and general procedures shall all be in accordance with the Manual for<br />

Construction and Supervision of Bituminous <strong>Works</strong>.<br />

(ii)Immediately after application of the modified binder, clean, dry aggregate shall be spread<br />

uniformly on the surface.<br />

522.3.5. Sweeping: The surface of SAMs and SAMIs shall be swept to ensure uniform spread of<br />

aggregate and that there are no loose chips on the surface.<br />

522.3.6. Two coat SAM or SAMI:<br />

(i)Where a two coat SAM or SAMI is required by the Contract, the second coat shall be applied<br />

within 90 days of the first.<br />

522.3.7. Geotextile placement: For bitumen impregnated geotextile, the requirements of Clause<br />

704.4.5 of the Ministry’s <strong>Specification</strong> for <strong>Road</strong> and <strong>Bridge</strong> <strong>Works</strong> (third revision) shall apply.<br />

522.4. Opening to Traffic<br />

(i)Traffic may be permitted over a SAM or SAMI 2 hours after rolling but the speed shall be limited<br />

to 20 km/h, until the following day.<br />

(ii)Speed control measures are to be approved by the Engineer in charge, prior to laying.<br />

522.5. Surface Finish and Quality Control of Work<br />

(a)The surface finish shall conform to the requirements of Clause 902.<br />

(b)For control on the quality of materials supplied and the works carried out, the relevant<br />

provisions of clause of 501.8.4.1.<br />

522.6. Arrangements for Traffic<br />

(i)During the period of con struction, arrangements for traffic shall be made as per direction on<br />

Engineer in charge.<br />

522.7. Measurement for Payment<br />

(i)Each application of SAM, SAMI or bitumen impregnated geotextile shall be measured as<br />

finished work, for the area specified, in square meters<br />

.<br />

522.8. Rate<br />

(i)The contract unit rate for SAM, SAMI or bitumen impregnated geotextile shall be payment in<br />

full for carrying out the required operations including full compensation for all components listed in<br />

Clause 501.8.8.2, (i) to (xi).