The floor space for the field laboratory shall include space for the storage of samples. The remaining<br />

space shall be provided for the installation of equipment, laboratory tables and cup boards, working space<br />

for carrying out various laboratory tests, besides a wash basin, toilet facility and a curing tank for the curing<br />

of samples, around 4 m x 2 m x 1 m in size and a fume chamber. Wooden/concrete working table with a<br />

working platform area of about 1m x 10 m shall be provided against the walls, also providing wooden<br />

cupboards above and below the working tables to store accessories such as, sample moulds etc. Atleast 4<br />

racks of slotted angles and M.S. sheets the size 1800 mm x 900 mm x 375 mm and atleast 6 stools for<br />

laboratory test operators of Godrej or equivalent make shall also be provided.<br />

120.3 Laboratory Equipment<br />

For the purpose of establishing laboratory, projects are categorized under following categories:<br />

a) Projects costing Rs 100 crore and above: and<br />

b) Projects costing less than Rs 100 crore.<br />

The items of laboratory equipment shall be provided in the field laboratory depending upon the items to be<br />

executed.<br />

Note : The items and their numbers listed above in this Section shall be decided by the Engineer as per<br />

requirements of the Project and modified accordingly.<br />

120.4 Ownership<br />

The field laboratory building and equipment shall be the property of the Contract or. The Employer and the<br />

Engineer shall have free access to the laboratory during construction and defects liability period of the<br />

Contract.<br />

120.5 Maintenance<br />

The Contractor shall arrange to maintain the field laboratory in a satisfactory manner until the issue of<br />

Taking over Certificate for the complete work. Maintenance includes all activities described in Section<br />

120.4.<br />

120.6 Rate<br />

Provision and maintenance of the field laboratory is not a payable item as it is incidental to the work.<br />

121 SUPPLY OF PROJECT RECORD<br />

121.1 Scope<br />

The work covers the supply digital record of project events in digital format (DVD/Flash Drive) including<br />

coloured photographs mounted on albums to serve as a permanent record of the work needed for an<br />

authentic documentation, as approved by the Engineer.<br />

121.2 Description<br />

The Contractor shall provide the following project records in digital format (DVD/Flash Drive) as directed by<br />

the Engineer :<br />

i) Record of work in each workfront : It shall cover the status of each workfront before start of work, during<br />

various stages of construction and after completion duly including the arrangements made (day & night) for<br />

traffic during construction (This shall be need based or as directed by the Engineer);<br />

ii) Record of quarry sites, plant sites, camp sites including labour camps, haul roads, access roads, etc. on<br />

quarterly basis;<br />

iii) Record of all accidents on project road/ various sites (quarry, plant, camp, etc.)<br />

The record shall be taken by a professional with a digital camera capable of taking still as well as video<br />

images having the facility to record the date and the background commentary. The Contractor shall keep<br />

separate discs/drives, one with the Engineer and the other with the Employer and update the data in these<br />

discs/drives on monthly basis. Separately, a video (in digital format) of maximum one hour duration<br />

covering interesting and novel features of the work duly editing the above master disc/drive shall also be<br />

maintained, one copy each kept with the Engineer and the Employer and updated on monthly basis. All