304.4 Measurements for Payment<br />

Excavation for structures shall be measured in cu.m for each class of material encountered, limited to<br />

the dimensions shown on the drawings or as directed by the Engineer. Excavation over increased width,<br />

cutting of slopes, production /support to the existing structures shoring, shuttering and planking shall be<br />

deemed as convenience for the Contractor in executing the work and shall not be measured and paid<br />

separately.<br />

Preparation of rock foundation shall be measured in square metres. Foundation sealing, dewatering,<br />

including pumping shall be deemed to be incidental to the work unless separate provision is made for in<br />

the Contract. In the latter case, payment shall be on lumpsum basis as provided in the Bill of<br />

Quantities.<br />

304.5 Rates<br />

304.5.1 The Contract unit rate for the items of excavation for structures shall be payment in full for<br />

carrying out the required operations including full compensation for:<br />

i) Setting out;<br />

ii) Construction of necessary cofferdams, cribs\sheeting, shoring and bracing and their subsequent<br />

removal;<br />

iii) Removal of all logs, stumps, grubs and other deleterious matter and obstructions, for placing<br />

the foundations including trimming of bottoms of excavations;<br />

iv) Foundation sealing, dewatering including pumping when no separate provision for it is made in<br />

the Contract:<br />

v) Backfilling, clearing up the site and disposal of all surplus material with all lifts and leads or as<br />

otherwise specified; and<br />

vi) All labour, materials, tools, equipment, safety measures, diversion of traffic and incidentals<br />

necessary to complete the work to <strong>Specification</strong>s.<br />

304.5.2 The Contract unit rate for preparation of rock foundation shall be full compensation for cutting,<br />

trimming and cleaning the foundation surface and filling/sealing of all seams with cement grout or mortar<br />

including all materials, labour and incidentals required for completing the work.<br />

304.5.3 Summary of excavation work in brief<br />

1. After site clearance, the limits of excavation should be set out true to lines, curves, slopes,<br />

grades and cross-sections as shown on the drawings by constructing reference pillars, back cutting<br />

lines, reference lines.<br />

2. If directed, the top soil shall be stripped to specified depths and stockpiled for reuse.<br />

3. Excavation shall be done manually or mechanically using machine. After excavation, the sides<br />

of excavated area should be trimmed and the area contoured to minimise erosion and ponding, allowing<br />

natural drainage to take place.<br />

4. The cut formation, which will serve as sub-grade, should be checked for its field dry density and<br />

if the field dry density of the material in the top 500 mm portion is less as compared to table No.-300-3,<br />

the formation material shall be loosened to a depth of 500 mm and compacted in layer to achive dry<br />

density as per Table No.- 300-3.<br />

5. In hilly areas, cutting should be done from top to bottom. Special attention should also be paid<br />

to side slopes.<br />

6. Rock when encountered in road excavation shall be removed upto the formation level. Where<br />

unstable shales or other unsuitable materials are encountered at the formation level, these shall be<br />

excavated to the extent of 500 mm below the formation level.<br />

7. In rocky formation, the surface irregularities shall be corrected with granular base material to<br />

achieve the specified profile and levels.<br />

8. Classification of Excavation shall be done as per clause 301.2.<br />

9. Blasting Operation shall be done as per Clause 302.<br />

10. Presplitting Rock Excavation Slopes shall be done as per Clause 303.