202.6. Measurements for Payment<br />

The work of dismantling structures shall be paid for in units indicated below by taking measurements<br />

before and after, as applicable:<br />

(i) Dismantling brick/stone masonry/concrete (plain and reinforced) cu. m.<br />

(ii) Dismantling flexible and cement concrete pavement cu. m.<br />

(iii) Dismantling steel structures tonne<br />

(iv) Dismantling limber structures cu. m.<br />

(v) Dismantling pipes, guard rails, kerbs, gutters and fencing linear m.<br />

(vi) Utility services Nos.<br />

202.7. Rates<br />

(i) The Contract unit rates for the various items of dismantling shall be paid in full for carrying out the<br />

required operations including full compensation for all labour, materials, tools, equipment, safeguards<br />

and incidents necessary to complete the work.<br />

(ii) These will also include excavation and backfilling where necessary to the required compaction and<br />

for handling, salvaging, piling and disposing of the dismantled materials within all lifts and up to a lead<br />

of 1000 m.<br />

Summary of Site Clearance<br />

1. The road land should be cleared of all materials unsuitable for the work by cutting, trimming,<br />

removing and disposing of all materials, such as trees, bushes, shrubs, stumps, roots, grass, weeds,<br />

top organic soil not exceeding 150 mm in thickness and rubbish, etc. This should be carried out well in<br />

advance of earthwork operations.<br />

2. The top soil removed during clearing and grubbing of site, if suitable for re-use shall be transported,<br />

conserved and stacked for re-use.<br />

3. All trees, stumps, etc. falling within the excavation and embankment lines should be cut to such<br />

depth below ground level that in no case these fall within 500 mm of the sub-grade. Beyond these<br />

limits, they need to be cut down to 500 mm below ground level.<br />

4. Excavations below the ground level arising out of removal of trees, stumps, etc., should be filled in<br />

layers with suitable material and compacted to the specified density given by the Engineer.<br />

5. Measurement of trees having girth more than 300 mm should be done as per sizes given in the Bill of<br />

Quantities (BOQ).<br />

6. Ant-hills both above and below the ground shall be removed by excavating to a suitable depth as<br />

directed by the Engineer. Cavities in the ground after removal of ant-hills shall be filled with appropriate<br />

material and properly compacted to the specified density.<br />

7. Existing structures which are within the road land and designated for removal should be dismantled<br />

carefully and the resulting materials so removed as not to cause any damage to the serviceable<br />

materials to be salvaged, the parts of the structure to be retained and any other adjoining properties<br />

and utilities.<br />

8. Holes and depressions caused by dismantling operations or caused by rats etc. shall be backfilled<br />

with approved material and compacted to the required density.<br />

9. Obtain prior permission of the competent authority for removing/disturbing any existing utilities etc.<br />

required.<br />

10. Conserve top-soil for re-use where suitable.<br />

11. Do not disturb existing poles, fences, signs, monuments, buildings, pipelines, sewers, and trees etc.<br />

which do not interfere with the work and are to be retained.<br />

12. Do not damage parts of existing structures to be retained while dismantling portions interfering with<br />

the work.