compacted by 80 to 100 kN smooth wheel roller, vibratory roller, hand roller, plate vibrator or hand<br />

rammer to obtain atleast 94 per cent of the maximum dry density in accordance with IS : 2720 (<strong>Part</strong> 8).<br />

The finished surface shall have the specified cross slope and line in accordance with the drawing. The<br />

side slopes shall be trimmed to the required slope with the help of grader or manual methods using<br />

hand tools.<br />

Wherever the earth is required to be excavated from the shoulder, this shall be done either<br />

using equipment like grader or by manual means using hand tools. The resulting surface shall be<br />

uniform and have a field density of atleast 94 per cent of maximum density obtained in accordance with<br />

IS : 2720 (Pan 8). 5f the surface is not uniformly compacted, it shall be excavated to a depth of 150 mm<br />

and the soil mixed with water if required and compacted at a moisture content close to the optimum to<br />

achieve 94 per cent of maximum density as stated above.<br />

3003.4. Measurements for Payment<br />

Maintenance of earthen shoulder shall be measured in sq. metres.<br />

3003.5. Rate<br />

The Contract unit rate for maintenance of earthen shoulder shall be payment in full<br />

compensation for:<br />

(i) furnishing earth required for making up of shoulders including all leads and lifts, cost of<br />

land and compaction;<br />

(ii) excavation of earth as required and disposal of the earth at the location approved; and<br />

(iii) all tools, equipments and incidentals to complete the work in accordance with the above<br />

<strong>Specification</strong>.<br />

3004. BITUMINOUS WORK IN CONNECTION WITH MAINTENANCE AND REPAIRS<br />

3004.1. Filling Pot-holes and Patch Repairs<br />

3004.1.1. Scope : This work shall include repair of pot-holes and patching of all types of bituminous<br />

surfaces with a bituminous mix either produced at plant site or at the site itself with manual method of<br />

mixing and placed at site in the pot holes or in patches after trimming the pot-hole or depression to<br />

proper shape and depth, side painting with tack coat and compacting the layer to the levels specified in<br />

the drawing.<br />

3004.1.2. Materials : The materials used for the pot-hole and patch repair of bituminous surface shall be<br />

as per the Contract and shall be of the same type as used for the existing bituminous surface, A mix<br />

superior to the one on existing surface can also be considered appropriate for repair work.<br />

An emulsified bitumen mix compatible with the existing layer shall also be considered<br />

appropriate.<br />

The grading of aggregates and bitumen content of the mix used for such patch repair shall be<br />

in accordance with Clause 501.<br />

3004.1.3. Preparation of the area for pot-hole and patch repair: Each pot-hole and patch repair area<br />

shall be inspected and all loose material removed. The area shall be cut/trimmed either with jack<br />

hammer or hand tools like chisels, pick-axes etc., such that the area is in the shape of a rectangle or<br />

square. The edges shall be cut vertically upto the level where the lower layer is stable without any loose<br />

material. The area shall be thoroughly cleaned with compressed air or any appropriate method<br />

approved by the Engineer to remove all dust and loose particles. The area shall be tacked or primed<br />

with cutback or emulsion depending upon whether the lower layer is bituminous or granular in nature.<br />

The sides, however, are to be painted with hoi lack coat material using a brush. The prime coat and<br />

tack coat shall conform to Clauses 502 and 503 of these <strong>Specification</strong>s, respectively.<br />

3004.1.4. Backfilling operation : The mix to be filled shall be either a hot mix or a cold storable mix_<br />

(using bituminous emulsion). Mixing shall be done in a plant of suitable capacity. It shall be placed in<br />

thicknesses not more than 100 mm (loose). H shall be compacted in layers with roller/plate<br />

compactor/hand roller/ rammer. While placing the final layer, the mix shall be spread slightly proud of<br />

the surface so that after rolling, the surface shall be flush with the adjoining surface. If the area is large,<br />

the spreading and levelling shall be done using hand shovel and wooden straight edge. During the<br />

process of compaction with roller or other means, the surface level shall be checked using a 3 m<br />

straightedge.