504.8. Rate<br />

The cont react unit rate for bituminous macadam shall be payment in full for carrying out the<br />

required operations as specified. The rate shall include for, all components listed in Clause<br />

501.8.8.2. (i) To (xi).<br />

505. BITUMINOUS PENETRATION MACADAM<br />

505.1 General<br />

The work shall consist of construction of one or more layers or compacted crushed coarse<br />

aggregate with alternate application of bituminous binder and key aggregates. To be used as a<br />

base course on roads subjected to the requirement of the over all pavement design and drawing<br />

are as directed by the Engineer in charge. Thickness of an individual course shall be 50 mm or 75<br />

mm, or other as specified.<br />

505.2 Materials<br />

505.2.1 Bitumen: The binder shall be paving bitumen either type one (bitumen from non waxy<br />

crude) or type two (bitumen from waxy crude) of suitable penetration grade within the range of S-<br />

35 to S-90 and A-35 to A-90 (30/40 to 80/100) as per with Indian standard specification for<br />

"Paving Bitumen’s" IS: 73 or approved cutback satisfying the requirement of IS: 217 OR 454. The<br />

actual grade of bitumen or cutback to be used shall be as specified or as directed by the Engineer<br />

in charge.<br />

0.06 0.015 0.09 0.018<br />

505.2.2. Quantities of materials and Aggregates: The aggregates shall satisfy the physical<br />

requirement set out in clause 504.2.2 and Table 500-3. The coarse and key aggregates shall<br />

conform to the grading given in Table 500-6.The quantities of material used for this work shall be<br />

as specified in table 500-6.<br />

TABLE 500-6<br />

Composition of Penetration Macadam<br />

IS Sieve Designation Cumulative per cent by weight of total aggregate passing<br />

(mm)<br />

For 50 mm compacted Thickness For 75mm compacted Thickness<br />

Coarse Key Aggregate Coarse Key Aggregate<br />

Aggregate<br />

Aggregate<br />

63 - - 100 -<br />

45 100 - 58 - 82 -<br />

26.5 37 - 72 - - 100<br />

22.4 - 100 5 - 27 50 - 75<br />

13.2 2 - 20 50 - 57 - -<br />

11.2 - - - 5 - 25<br />

5.6 - 5 - 25 - -<br />

2.8 0 - 5 0 - 5 0 - 5 0 - 5<br />

Approx. loose<br />

cu.m/m 2<br />

aggregate quantities<br />

Binder quantity 5 6.8<br />

(penetration grade)<br />

(kg/m 2 )<br />

Note :(l) f cutback bitumen is used, adjust binder quantity such that the residual bitumen is equal<br />

to the values in this table.<br />

505.3. Construction Operation:<br />

505.3.1. Weather and Seasonal Limitations: The provisions of clause 501.5.1. Shall apply.