(i)It is usual to use ordinary Portland cement, hydrated lime or other additives to control<br />

consistency, mix segregation and setting rate.<br />

(ii)The proportion of the additive should not normally exceed 2 percent by weight of dry<br />

aggregates.<br />

516.3. Mixture Design<br />

(i)A range of residual binder contents for each aggregate grading is given in Table 500-33.<br />

(ii)The optimum mixture design for the aggregate, additive, water and bitumen emulsion mixture<br />

should be determined in accordance with ASTM D 3910.<br />

516.4. Construction Operations<br />

516.4.1. Weather and seasonal limitations: Clause 501.5.1 shall apply.<br />

TABLE 500-33.<br />

AGGREGATE GRADING, BINDER CONTENT AND APPROXIMATE COVERAGE RATE<br />

Percentage by mass pissing<br />

finished thickness of sealing<br />

5mm 3mm 1. 5mm<br />

9.5 100 - --<br />

4.75 90 - 100 100 —<br />

3.35 - 80- 100 100<br />

236 65 - 90 75-100 95-100<br />

1.18 45 - 70 55 -90 70-95<br />

0.600 30 - 50 35 -70 55-75<br />

0.300 18- 30 20- 45 30- 50<br />

0.150 10-21 10-25 10-30<br />

0.075 5- 15 5- 15 5-15<br />

Sieve Size (mm)<br />

Quantity of residual<br />

binder<br />

percentage by mass<br />

of aggregate<br />

Approximate<br />

coverage rate<br />

(kg/m 2)<br />

7.5- 13.5 10- 16 12-20<br />

8 -15 4-6 2-4<br />

516.4.2. Surface preparation:<br />

(i)Any necessary remedial work to the road surface and structure shall be completed either prior<br />

to or as part of the Contract or agreed as acceptable by the Engineer in charge, according to the<br />

provisions of Clause 501.<br />

(ii)Before slurry seal is applied, street furniture and, where directed by the Engineer in charge,<br />

road markings, shall be masked using self-adhesive masking material or other material firmly<br />

secured against the passage of the spreader box or the tools used for hand laying.<br />

(iii)Any packed mud or other deposits on the surface shall be removed, all organic growth shall be<br />

removed by suitable means, and the surface shall be swept free of all loose material.<br />

516.4.3. Tack coat:<br />

(i)If required by the Engineer in charge, a tack coat may be applied prior to the slurry seal, with or<br />

without grit or chips, in order to seal the existing substrata and enhance the bond to the existing<br />

road surface.<br />

(ii)Unless otherwise agreed by the Engineer in charge, the rate of spread of tack coat shall be<br />

0.15 to 0.30 litres/m2 for bituminous surfaces and 0.4 to 0.6 litres/m2 for concrete surfaces<br />

516.4.4. Mixing and transportation of mixture:<br />

(i)Mixing (and laying) techniques vary according to the type of emulsion used.