(ii) Separately as 25 mm nominal single size, 12.5 mm nominal size graded aggregates and Tine<br />

aggregate of crushed stone dust or sand or a combination of these two.<br />

The material after blending shall conform to the grading as indicated in Table 600-1.<br />

TABLE 600-1. AGGREGATE GRADATION FOR DRY LEAN CONCRETE<br />

Sieve Designation<br />

26.50 mm<br />

19.00 mm<br />

9.50 mm<br />

4.75 mm<br />

600.00 micron<br />

75.00 micron<br />

Percentage passing the sieve by weight<br />

100<br />

80-100<br />

55-75<br />

35-60<br />

10-35<br />

0-8<br />

601.2.4. Water: Water used for mixing and curing of concrete shall be clean and free from<br />

injurious amounts of oil, salt, acid, vegetable matter or other substances harmful to the finished<br />

concrete. It shall meet the requirements stipulated in IS : 456.<br />

601.2.5. Storage of materials: All materials shall be stored in accordance with the provisions of<br />

Clause 1014 of these <strong>Specification</strong>s and other relevant IS <strong>Specification</strong>s. All efforts must be<br />

made to store the materials in proper places so as to prevent their deterioration or contamination<br />

by foreign matter and to ensure their satisfactory quality and fitness for use in the work. The<br />

storage place must also permit easy inspection, removal and storage of materials. All such<br />

materials even though stored in approved godowns must be subjected to acceptance lest<br />

immediately prior to their use. The requirement of storage yard specified in Clause 602.2.9 shall<br />

also be applicable.<br />

601.3. Proportioning of Materials for the Mix<br />

601.3.1. The mix shall be proportioned with a maximum aggregate cement ratio of 15: 1. The<br />

waiter content shall be adjusted to the optimum as per Clause 601.3.2 for facilitating compaction<br />

by rolling. The strength and density requirements of concrete shall be determined in accordance<br />

with Clause 601.6 by making trial mixes.<br />

601.3.2. Moisture content: The right amount of water for the lean concrete in the main work shall<br />

be decided so as to ensure full compaction under rolling and shall be assessed at the time of<br />

rolling the trial length. Too much water will cause the lean concrete to be heaving up before the<br />

wheels and picked up on the wheels of the roller and too little will lead to inadequate compaction,<br />

a low in-situ strength and an open-textured surface.<br />

The optimum water content shall be determined and demonstrated by rolling during trial length<br />

construction and the optimum moisture content and degree of compaction shall be got approved<br />

from the Engineer. While laying in the main work, the lean concrete shall have a moisture content<br />

between the optimum and optimum +2 per cent, keeping in view the effectiveness of compaction<br />

achieved and to compensate for evaporation losses.<br />

601.3.3. Cement content: The minimum cement content in the lean concrete shall not be less<br />

than 150 kg/cu.m. of concrete. If this minimum cement content is not sufficient to produce<br />

concrete of UK specified strength, it shall be increased as necessary without additional cost<br />

compensation to the Contractor.<br />

601.3.4. Concrete strength: The average compressive strength of each consecutive group of 5<br />

cubes made in accordance with Clause 903.5.1.1 shall not be less than 10 MPa at 7 days. In<br />

addition, the minimum compressive strength of any individual cube shall not be less than 7.5 MPa<br />

at 7 days. The design mix complying with the above Clauses shall be got approved from the<br />

Engineer and demonstrated in the trial length construction.