27.01.2015 Views

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

Specification Part 3 - Road & Bridge Works - Urban Administration ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The surface finish of construction shall conform to the requirements as for W.B.M.<br />

Control on the quality of materials and works shall be exercised by the Engineer in charge and shall be as per<br />

quality control of W.B.M.<br />

410.5. Arrangements for Traffic<br />

During the period of construction, arrangement of traffic shall be maintained same as in the case of W.B.M.<br />

410.6. Measurements for Payment<br />

Crusher-run macadam base shall be measured as finished work in position in cubic meters.<br />

410.7. Rate<br />

The Contract unit rate for crusher run macadam base shall be payment in full for carrying out the required<br />

operations including full compensation for items as in Clause 401.8 (i) to (v)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!