- Page 1 and 2:
GOVERNMENT OF MADHYA PRADESH, URBAN
- Page 3 and 4:
SECTION 100
- Page 5 and 6:
101 INTRODUCTION These specificatio
- Page 7 and 8:
13.2 74 *11.2 *63 9.50 53 *8.00 *45
- Page 9 and 10:
107 CONTRACT DRAWINGS 107.1 The Con
- Page 11 and 12:
110.3 No clearance or alterations t
- Page 13 and 14:
Any vehicle with open load-carrying
- Page 15 and 16:
warning lights of similar type shal
- Page 17 and 18:
Location of the scales shall be as
- Page 19 and 20:
c) Sequence of construction and det
- Page 21 and 22:
ecording shall be done in the prese
- Page 23 and 24:
IRC : 47-1972 IRC : 48-1972 Tentati
- Page 25 and 26:
Number Designation IS:1216-1978 IS:
- Page 27 and 28:
Number Designation IS:12269-1987 IS
- Page 29 and 30:
Number Designation BS:7542 CRR I &
- Page 31 and 32:
CONTENT Clause No Description 201 S
- Page 33 and 34:
(v) All products of clearing and gr
- Page 35 and 36:
202.6. Measurements for Payment The
- Page 37 and 38:
CONTENT Clause No Description 301 E
- Page 39 and 40:
301.3 Construction Operations 301.3
- Page 41 and 42:
301.6 Preparation of Cut Formation
- Page 43 and 44:
(13) At a time, not more than 10 ch
- Page 45 and 46:
All overburden soil and weathered r
- Page 47 and 48:
If it is determined beforehand that
- Page 49 and 50:
11. Excavation in marshes shall beg
- Page 51 and 52:
Table 300-2 Compaction Requirements
- Page 53 and 54:
maintained at such a crossfall (not
- Page 55 and 56:
(c) Only the materials satisfying t
- Page 57 and 58:
4 Where the available embankment ma
- Page 59 and 60:
of drainage. 309.2 Surface Drains S
- Page 61 and 62:
Damage to the fabric resulting from
- Page 63 and 64:
CONTENT Clause No 401 GRANULAR SUB-
- Page 65 and 66:
TABLE 400-1. GRADING FOR CLOSE -GRA
- Page 67 and 68:
(iii) Compaction: Density shall be
- Page 69 and 70:
402.3.6. Addition of lime: Lime may
- Page 71 and 72:
TABLE 400 -6. PHYSICAL REQUIREMENTS
- Page 73 and 74:
The consolidated details of quantit
- Page 75 and 76:
(4) Rolling shall be discontinued w
- Page 77 and 78:
(ii) Furnishing all materials to be
- Page 79 and 80:
(4) Optimum moisture for mixing sha
- Page 81 and 82:
406.8 Measurements for Payment Wet
- Page 83 and 84:
iv) For kerb in running meters v) F
- Page 85 and 86:
409.3.4 Precast cement concrete blo
- Page 87 and 88:
The surface finish of construction
- Page 89 and 90:
CONTENT Clause No Description 501 G
- Page 91 and 92:
(k) Use of Premix seal coat:- It is
- Page 93 and 94:
Number 0 and 1 are of very low cons
- Page 95 and 96:
area beyond it, shall be laid by ha
- Page 97 and 98:
501.8. Preparation of Surface 501.8
- Page 99 and 100:
Normally, the maximum layer thickne
- Page 101 and 102:
5. 6. Bituminous penetration macada
- Page 103 and 104:
Control of temperature of binder in
- Page 105 and 106:
501.8.7.5 Tack coat: This is to be
- Page 107 and 108:
6. Emergency Response 6.1. The Cont
- Page 109 and 110:
carpet to ensure a proper bond betw
- Page 111 and 112:
504.2.2. Coarse aggregates: (i)The
- Page 113 and 114:
504.8. Rate The cont react unit rat
- Page 115 and 116:
505.7. Measurement for Payment Pene
- Page 117 and 118:
The contract unit rate for built-up
- Page 119 and 120:
507.3. Mixture Design 507.3.1. Requ
- Page 121 and 122:
507.4. Construction Operations 507.
- Page 123 and 124:
1. IS: 2386 Part 1 2. IS: 2386 Part
- Page 125 and 126:
508.8. Measurement for Payment The
- Page 127 and 128:
Notes: 1. The combined aggregate gr
- Page 129 and 130:
ase, followed by a cover of stone c
- Page 131 and 132:
The equipment and general procedure
- Page 133 and 134:
Aggregates (a) Nominal Stone size 1
- Page 135 and 136:
(A) Premix Carpet (a) Coarse aggreg
- Page 137 and 138:
511.2.6. Surface finish and quality
- Page 139 and 140:
(i)The stone chips shall consist of
- Page 141 and 142:
S. No. Nominal size of aggregate De
- Page 143 and 144:
* In cold climatic regions (tempera
- Page 145 and 146:
(vi)During cooking and mixing, care
- Page 147 and 148:
(i)It is usual to use ordinary Port
- Page 149 and 150:
(iii)The Contractor shall monitor t
- Page 151 and 152:
519.2.1.3. Aggregate grading and bi
- Page 153 and 154:
evaporation of water and/or solvent
- Page 155 and 156:
519.3.1.3 Aggregate grading and bin
- Page 157 and 158:
519.3.6. Measurement for payment: R
- Page 159 and 160:
Loss in Weight, %., Maximum Increas
- Page 161 and 162:
522.2. Materials 522.2.1. Binder: B
- Page 164 and 165:
600 Concrete Pavements
- Page 166 and 167:
601. DRY LEAN CEMENT CONCRETE SUB-B
- Page 168 and 169:
601.4. Subgrade The subgrade shall
- Page 170 and 171:
601.5.7. Curing: As soon as the lea
- Page 172 and 173:
602.2. Materials 602.2.1. Source of
- Page 174 and 175:
602.3.2. Cement content: The cement
- Page 176 and 177:
602.6.2.2. Contraction joints: Cont
- Page 178 and 179:
602.6.6. Tie bars 602.6.6.1. Tie ba
- Page 180 and 181:
602.9.3.2. Batching plant and equip
- Page 182 and 183:
602.9.5.2. The concrete shall be di
- Page 184 and 185:
mechanical sprayer shall incorporat
- Page 186 and 187:
after concrete has set to expose do
- Page 188 and 189:
joints is completed including the c
- Page 190 and 191:
603.2.3.4. The coarse and fine aggr
- Page 192:
603.9. Tolerances for Surface Regul
- Page 195 and 196:
701 GEOSYNTHETICS IN ROAD AND BRIDG
- Page 197 and 198:
Table 700-2 Geotextile Requirements
- Page 199 and 200:
strong acid/bases, flames including
- Page 201 and 202: 702.4 Measurement for Payment The g
- Page 203 and 204: dimensional stability relative to e
- Page 205 and 206: 706 GEOSYNTHETICS FOR HIGHWAY PAVEM
- Page 207 and 208: 707.2.3 Tack coat: The tack coat us
- Page 209 and 210: 708.3.2 Construction and installati
- Page 211 and 212: CONTENT Clause No Description 801 T
- Page 213 and 214: 801.3.1. General requirements: The
- Page 215 and 216: lack free adhesive activated by hea
- Page 217 and 218: (iii) (iv) (v) (vi) (vii) (viii) (i
- Page 219 and 220: 802.1.1. Overhead signs may be used
- Page 221 and 222: 802.7.6. Before erecting support st
- Page 223 and 224: (c) Skid resistance : not less than
- Page 225 and 226: (b) The marking shall not lift from
- Page 227 and 228: The work covers supplying and fixin
- Page 229 and 230: 809.3.1. The location of crash barr
- Page 231: 810.7.3. No measurement for payment
- Page 234 and 235: 901. GENERAL 901.1. All materials t
- Page 236 and 237: 902.3. Surface Levels The levels of
- Page 238 and 239: eplacement of a bituminous layer is
- Page 240 and 241: per 5 tones 3. Water Bound Macadam
- Page 243 and 244: CONTENT Clause No Description 1001
- Page 245 and 246: ecommended threshold values as per
- Page 247 and 248: S 415 IS:17B6 High Yield 415 200 St
- Page 249 and 250: and testing of concrete. The contra
- Page 251: prevented. The use of correctly for
- Page 255 and 256: 1101. DESCRIPTION 1101.1. This work
- Page 257 and 258: (i) The strength of the concrete in
- Page 259 and 260: place as judged convenient without
- Page 261 and 262: If there is a major variation betwe
- Page 263 and 264: concrete outside the tremie pipe at
- Page 266 and 267: CONTENT Clause No Description 1201
- Page 268 and 269: 1203.2. For wells which are to be p
- Page 270 and 271: where obstacles such as tree trunks
- Page 272 and 273: Every employee absent from work for
- Page 274 and 275: g) Very deep sump shall not be made
- Page 276 and 277: 1211. WELL CAP A reinforced cement
- Page 278 and 279: 1300- Brick Masonry
- Page 280 and 281: 1301. DESCRIPTION This work shall c
- Page 282 and 283: wetted, so as to effect the best po
- Page 284 and 285: No portion of the surface shall be
- Page 286 and 287: 1400 Stone Masonry
- Page 288 and 289: 1401. DESCRIPTION This work shall c
- Page 290 and 291: The practice of building up thin fa
- Page 292 and 293: 1405.4.7. Joints : The face joints
- Page 294 and 295: 1500 Formwork
- Page 296 and 297: 1501. DESCRIPTION Formwork shall in
- Page 298 and 299: (vi) Water used for curing should n
- Page 300 and 301: 1600 STEEL REINFORCEMENT (UNTENSION
- Page 302 and 303:
1601. DESCRIPTION This work shall c
- Page 304 and 305:
een secured and the carbon equivale
- Page 306 and 307:
1700 STRUCTURAL CONCRETE
- Page 308 and 309:
1701. DESCRIPTION The work shall co
- Page 310 and 311:
The mix shall have the consistency
- Page 312 and 313:
) The total sulphuric anhydride (SO
- Page 314 and 315:
formwork. All formwork and reinforc
- Page 316 and 317:
The Contractor will be required to
- Page 318 and 319:
3. ISO mm cubes shall be made, cure
- Page 320 and 321:
1800 PRESTRESSING
- Page 322 and 323:
1801. DESCRIPTION Structural concre
- Page 324 and 325:
1804.3. Positioning 1804.3.1. Post-
- Page 326 and 327:
All tensioning equipment shall be p
- Page 328 and 329:
strands/wires have been anchored to
- Page 330 and 331:
1815. RATE The contract unit rate f
- Page 332 and 333:
CONTENT Clause No Description 1901
- Page 334 and 335:
IS:1363 Hexagon head bolts, screw a
- Page 336 and 337:
Outside edges of plate and section,
- Page 338 and 339:
Rivets shall be healed uniformly to
- Page 340 and 341:
1904.7 Shop Erection and Match Mark
- Page 342 and 343:
Tolerances in dimensions of compone
- Page 344 and 345:
Prior to actual commencement of ere
- Page 346 and 347:
1905.7.2. No protective treatment s
- Page 348 and 349:
The stud weld shall not show any si
- Page 350 and 351:
1906.1.4. Quality of paint : The pa
- Page 352 and 353:
ii) iii) iv) Wire brush to remove a
- Page 355 and 356:
CONTENT Clause No Description 2001
- Page 357 and 358:
2003.2. Construction Operations a)
- Page 359 and 360:
h) Placing of the bearing and morta
- Page 361 and 362:
iv) Depth of embedment of the backi
- Page 363 and 364:
The bearings shall be fabricated wi
- Page 365 and 366:
Composition (see Note 1 below) Hard
- Page 367 and 368:
for inspection, according to the sp
- Page 369 and 370:
Name Rotation Element Sliding Eleme
- Page 371 and 372:
2006.3. Materials a) Steel i) Struc
- Page 373 and 374:
) Forms ->sturdiness, leak proofing
- Page 375 and 376:
2100 Open Foundations
- Page 377 and 378:
2101. DESCRIPTION The work shall co
- Page 379 and 380:
2200 Sub-structure
- Page 381 and 382:
2201. DESCRIPTION The work shall co
- Page 383 and 384:
2300 Concrete Superstructure
- Page 385 and 386:
2301. DESCRIPTION The work shall co
- Page 387 and 388:
a) upto and including 2m : + 5 mm o
- Page 389 and 390:
CONTENT Clause No Description 2401
- Page 391 and 392:
2402.1.1. Preliminary exploration s
- Page 393 and 394:
2404.7.2. Drilling through rock is
- Page 395 and 396:
2408.1. For proper identification o
- Page 397 and 398:
2411.1.1. Cohesion less soil a) Cla
- Page 399 and 400:
2414. RATE The contract unit rate s
- Page 401 and 402:
CONTENT Clause No Description 2501
- Page 403 and 404:
The stones used in apron shall be s
- Page 405 and 406:
Notes : 1. Filter design may not be
- Page 407 and 408:
The earth work in construction of e
- Page 409 and 410:
CONTENT Clause No Description 2601
- Page 411 and 412:
Any acceptance of alternative types
- Page 413 and 414:
thick premoulded joint filler Tilli
- Page 415 and 416:
2606.3. Supply and Handling i) The
- Page 417 and 418:
e) Pre-Setting i) The main purpose
- Page 419 and 420:
2607. STRIP SEAL EXPANSION JOINT 26
- Page 421 and 422:
c) Expansion joint material shall b
- Page 423 and 424:
2609. MEASUREMENTS FOR PAYMENT The
- Page 425 and 426:
CONTENT Clause No Description 2701
- Page 427 and 428:
2703.2. Metal Railings Materials, f
- Page 429 and 430:
of all labour, material, tools and
- Page 431 and 432:
CONTENT Clause No Description 2801
- Page 433 and 434:
Celsius * In the case of two compon
- Page 435 and 436:
a) Penel ration/Visual Examination
- Page 437 and 438:
used for this purpose may be Aceton
- Page 439 and 440:
NOTE : For specialised treatment li
- Page 441 and 442:
existing structure including reinfo
- Page 443 and 444:
2900 Pipe Culverts
- Page 445 and 446:
2901. SCOPE This work shall consist
- Page 447 and 448:
R.C.C. pipe culverts shall be measu
- Page 449 and 450:
CONTENT Clause No Description 3001
- Page 451 and 452:
compacted by 80 to 100 kN smooth wh
- Page 453:
depth can be controlled. The depth