A few cores may be cut as per the instructions of the Engineer to check segregation or any other<br />

deficiency.<br />

601.7.4. The hardened concrete shall be cut over 3 m width and reversed to inspect the bottom<br />

surface for any segregation taking place. The trial length shall be constructed after making<br />

necessary changes in the gradation of the mix to eliminate segregation of the mix. The lower<br />

surface shall not have honey combing and the aggregates shall not be held loosely at the edges.<br />

601.7.5. The trial length shall be outside the main works. The main work shall not start until the<br />

trial length has been approved by the Engineer. After approval has been given, the materials, mix<br />

proportions, moisture content, mixing, laying, compaction plant and construction procedures shall<br />

not be changed without the approval of the Engineer.<br />

601.8. Tolerances for Surface Regularity, Level, Thickness, Density and Strength<br />

The tolerances for surface regularity, level, thickness, density and strength shall conform to the<br />

requirements given in Clause 903.5. Control of quality of materials and works shall be exercised<br />

by the Engineer in accordance with Section 900.<br />

601.9. Traffic<br />

No heavy commercial vehicles like trucks and buses shall be permitted on the lean concrete subbase<br />

after its construction. Light vehicles if unavoidable may, however, be allowed af ter 7 days of<br />

its construction with prior approval of the Engineer.<br />

601.10. Measurements for Payment<br />

The unit of measurement for dry lean concrete pavement shall be the cubic meter of concrete<br />

placed, based on the net plan areas for the specified thickness shown on the drawings or as<br />

directed by the Engineer.<br />

601.11. Rate<br />

The Contract unit rate payable for dry lean concrete sub-base shall be payment in full for carrying<br />

out the required operations including full compensation for all labour, materials and equipment,<br />

mixing, transport, placing, compacting, finishing, curing, testing and incidentals to complete the<br />

work as per <strong>Specification</strong>s, all royalties, fees, storage and rents where necessary and all leads<br />

and lifts.<br />

602. CEMENT CONCRETE PAVEMENT<br />

602.1. Scope<br />

602.1.1. The work shall consist of construction of unreinforced, dowel jointed, plain cement<br />

oncrete pavement in accordance with the requirements of these <strong>Specification</strong>s and in conformity<br />

with the lines, grades and cross sections shown on the drawings. The work shall include<br />

furnishing of all plant and equipment, materials and labour and performing all operations in<br />

connection with the work, as approved by trie Engineer.<br />

602.1.2. The design parameters, viz,, thickness of pavement slab, grade of concrete, joint details<br />

etc. shall be as stipulated in the drawings.