Minimum Stability (kN at 22. 2.2 for paving 2.2 for maintenance<br />

2°C) Emulsion (kN at 25"C)<br />

3.3 for paving<br />

Cutback<br />

Percent maximum stability 50 25<br />

loss on soaking<br />

Minimum flow (mm) 2 2<br />

Compaction level (number of 50 75<br />

blows)<br />

Per cent air voids 3-5 3-5<br />

Per cent voids in mineral See table 500-38<br />

aggregate (VMA)<br />

Percent minimum coating6 50 -<br />

Notes:<br />

1 Using "Marshall Method for emulsified asphalt -aggregate cold mixture design". Appendix K,<br />

MS -14.<br />

2 Using "Marshall method for cut -back asphalt -aggregate cold mixture design". Appendix H. MS-<br />

14.<br />

3 With vacuum saturation Mid immersion.<br />

4 Hour days soak at 25°C.<br />

5 Refers to total voids in the mix occupied by air and water.<br />

6 Coating Test, Appendix 1;, MS-14.<br />

TABLE 500-38.<br />

MINIMUM PER CENT VOIDS IN MINERAL AGGREGATE (VMA)<br />

Nominal Maximum<br />

Minimum VMA (per cent)<br />

<strong>Part</strong>icle Size<br />

IS Sieve (mm)<br />

9.5 16.0<br />

12.5 15.0<br />

19.0 14.0<br />

25.0 13.0<br />

37.5 12.0<br />

ingredients satisfy the physical and strength requirements of these <strong>Specification</strong>s.<br />

(7)Approval of the job mix formula shall be based on independent testing by the Engineer in<br />

charge for which samples selected jointly with the Engineer in charge of all ingredients of the mix<br />

shall be furnished by the Contractor as required by the former.<br />

(8)The approved job mix formula shall remain effective unless and until modified by the Engineer<br />

in charge.<br />

(9)Should a change in the source of materials be proposed, a new job mix formula shall be<br />

established and approved by the Engineer in charge before actually using the materials.<br />

519.2.2.4. Permissible variation from the job mix formula:<br />

(i)It shall be the responsibility of the Contractor to produce a uniform mix conforming to the<br />

approved job mix formula, subject to the permissible variations of the individual percentages of<br />

the various ingredients in the actual mix from the job mix formula to be used, within the limits as<br />

specified in Table 500-39.<br />

(ii)These variations are intended to apply to individual specimens taken for quality control tests in<br />

accordance with Section 900.<br />

519.2.3. Construction operations<br />

519.2.3.1. Weather and seasonal limitations: Construction with cold mix must not be<br />

undertaken when ambient temperatures below 10°C are expected, during rain, in standing water,<br />

or generally when poor weather is predicted. Bitumen emulsions and cutbacks depend on the