501.8.2.4. Profile corrective course and its application: The type of material for use as profile<br />

corrective course shall be as shown on the approved drawings or as directed by the Engineer in<br />

charge. Where it is to be laid as part of the overlay/strengthening course, the profile corrective<br />

course material shall be of the same specification as that of the overlay/ strengthening course.<br />

However, if provided as a separate layer, it shall be of the specification and details given in the<br />

approved drawings.<br />

(i)Any high spots in the existing surface shall be removed by a milling machine or other approved<br />

method, and all loose material shall be removed to the satisfaction of the<br />

Engineer<br />

(ii)Where the maximum thickness of profile corrective course will be not more than 40 mm, the<br />

profile corrective course shall be constructed as an integral part of the overlay course. In other<br />

cases, the profile corrective course shall be constructed as a separate layer, adopting such<br />

construction procedures and using such equipment as approved by the Engineer in charge, to lay<br />

the specified type of material, to thickness and tolerance as specified, for the course, to be<br />

provided.<br />

501.8.3. Construction Operations<br />

501.8.3.1. Preparing existing granular surface:<br />

(i) All loose materials shall be removed from existing granular surface.<br />

(ii)The existing granular surface shall be lightly watered where the profile corrective course to be<br />

provided as a separate layer is also granular.<br />

(iii)Where the profile corrective course of bituminous material is to be laid over the existing<br />

granular surface, the existing granular surface shall be primed, after removal of all loose material.<br />

(iv)The surface finish of all granular layers on which bituminous works are to be placed, shall be<br />

free form dust. All such layers must be capable of being swept, after the removal of any non -<br />

integral loose material, by means of a mechanical broom, without shedding significant quantities<br />

of material and dust removed by air jet, washing, or other means approved by the Engineer in<br />

charge. After cleaning the surface shall be correct to line and level, within the tolerances specified<br />

for base course.<br />

501.8.3.2. Scarifying existing bituminous surface: Where required, the existing bituminous<br />

layer in the specified width shall be removed with care and without causing undue disturbance to<br />

the underlying layer, by a suitable method approved by the Engineer in charge. After removal, all<br />

loose and disintegrated material, the underlying layers which might have been disturbed should<br />

be suitably reworked and compacted to line and level. After supplementing the base material as<br />

necessary with suitable fresh stone, the compacted finished surface shall be primed in<br />

accordance with Clause 502. Reusable materials shall be stacked as directed by the Engineer in<br />

charge within one kilometer of their origin.<br />

501.8.3.3. Patching of potholes and sealing of cracks: shall be done as per clause 501.8.2.2.<br />

501.8.3.4. Laying the profile corrective course<br />

501.8.3.4.1. Laying on granular base: After preparing the granular surface in accordance with<br />

Clauses 501.8.3.1 and 501.8.3.2, the profile corrective course shall be laid using material as<br />

described in Clauses 501.8.2.3 and 501.8.2.4, or as otherwise described in the Contract, and<br />

compacted to the requirements of the particular <strong>Specification</strong>.<br />

501.8.3.4.2. Laying on existing bituminous surface: The existing bituminous surface shall be<br />

prepared in accordance with Clause 501.8.3.3, and after applying a tack coat conforming to<br />

Clause 503, the bituminous profile corrective course shall be laid and compacted to the<br />

requirements of the particular <strong>Specification</strong>.<br />

501.8.3.4.3. Correction of local depressions: Where local sags or depressions occur in the<br />

existing pavement, a specific filling operation shall be instructed by the Engineer in charge.