Unless specified otherwise, equipment for production, transportation and compaction of concrete<br />

shall be as under:<br />

a) For Production of Concrete:<br />

i) For overall bridge length of less than 200 melees - batch type concrete mixer diesel or electric<br />

operated, with a minimum size of 200 liters, automatic water measuring system and integral<br />

weighed (hydraulic/pneumatic type)<br />

ii) For overall bridge length of 200 meters or more - concrete batching and mixing plant fully<br />

automatic with minimum capacity of 15 c.m. Per hour. All measuring devices of the equipment<br />

shall be maintained in a clean and serviceable condition. Its accuracy shall be checked ove r the<br />

range in use, when set up at each site and thereafter periodically as directed by the Engineer in<br />

charge. The accuracy of the measuring devices shall fall within the following limits:<br />

Measurement of Cement<br />

± 3 per cent of the quantity °f cement in each batch<br />

Measurement of Water<br />

± 3 per cent of the quantity of water in each batch<br />

Measurement of Aggregate<br />

± 3 per cent of the quantity of aggregate in each batch<br />

Measurement of Admixture<br />

± 5 per cent of the quantity of admixture in each batch<br />

b) For Concrete Transportation depending upon actual requirement<br />

1) Concrete dumpers minimum 2 tonnes capacity<br />

2) Powered hoists minimum 0.5 tonnes capacity<br />

3) Chutes<br />

4) Buckets handled by cranes<br />

5) Transit truck mixer<br />

6) Concrete pump<br />

7) Concrete distributor booms<br />

8) Belt conveyor<br />

9) Cranes with skips<br />

10) Tremie<br />

c) For Compaction of Concrete:<br />

i) Internal vibrators size 25 mm lo 70 mm<br />

ii) Form vibrators<br />

minimum 500 walls<br />

iii) Screed vibrators<br />

full width of carriageway<br />

(Up to two lanes)<br />

1708. MIXING CONCRETE<br />

Concrete shall be mixed either in a concrete mixer or in a batching and mixing plant, as per these<br />

specifications. Hand mixing shall not be permitted. The mixer or the plant shall be at an approved<br />

location considering the properties of the mixes and the transportation arrangements available<br />

with the Contractor. The mixer or the plant shall be approved by the Engineer in charge. Mixing<br />

shall be continued till materials arc uniformly distributed and a uniform colour of die entire mass is<br />

obtained, and each individual particle of the coarse aggregate shows complete coating of mortar<br />

containing its proportionate amount of cement. In no case shall mixing be done for less than 2<br />

minutes. Mixers which have been out of use for more than 30 minutes shall be thoroughly<br />

cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer in charge, the<br />

first batch of concrete from the mixer shall contain only two thirds of the normal quantity of coarse<br />

aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of cement to<br />

another.<br />

1709. TRANSPORTING, PLACING AND COMPACTION OF CONCRETE<br />

The method of transporting and placing concrete shall be approved by the Engineer in charge.<br />

Concrete shall be transported and placed as near as practicable to its final position, so that no<br />

contamination, segregation or loss of its constituent materials Lakes place. Concrete shall not be<br />

freely dropped into place from a height exceeding 1.5 meters. When concrete is conveyed by<br />

chute, the plant shall be of such size and design as to ensure practically continuous flow. Slope of<br />

the chute shall be so adjusted that the concrete flows with out the use of excessive quantity of<br />

water and without any segregation of its ingredients. The delivery end of the chute shall be as<br />

close as possible to the point of deposit. The chute shall be thoroughly flushed with water before<br />

and after each working period and the water used for this purpose shall be discharged outside the