The Contractor will be required to suite his methodology for the Engineer in charge’s<br />

approval when temperatures of concrete arc likely lo exceed 40 degrees Celsius during the work.<br />

1713. PROTECTION AND CURING<br />

Concreting operations shall not commence until adequate arrangements for concrete curing have<br />

been made by the Contractor. Curing and protection of concrete shall start immediately after<br />

compaction of the concrete to protect it from:<br />

a) Premature drying out particularly by solar radiation and wind<br />

b) High internal thermal gradients<br />

c) Leaching out by rain and flowing water<br />

d) Rapid cooling during the first few days after placing<br />

e) Low temperature or frost<br />

f) Vibration and impact which may disrupt the concrete and interfere with its bond to the<br />

reinforcement Where members are of considerable size and length , with high c ement content,<br />

accelerated curing methods may be applied, as approved by the Engineer in charge.<br />

1713.1. Water Curing<br />

Water for curing shall be as specified in Section 1000. Sea water shall not be used for curing.<br />

Sea water shall not come into contact with concrete members unless it has attained adequate<br />

strength.<br />

Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by<br />

ponding or by covering with a layer of sacks, canvas, Hessian or similar materials and shall be<br />

kepi constantly wet for a period of not less than 14 days from the date of placing of concrete.<br />

1713.2. Steam Curing<br />

Where steam curing is adopted, it shall be ensured that it is done in a suitable enclosure to<br />

contain the live steam in order 10 minimize moisture and heat losses. The initial application of the<br />

steam shall be after about four hours of placement of concrete to allow the initial set of the<br />

concrete 10 take place.<br />

Where readers are used, the waiting period before application of the steam shall be<br />

increased to about six hours.<br />

The steam shall be at 100 per cent relative humidity to prevent loss of moisture and to<br />

provide excess moisture for proper hydration of the cement. The application of steam shall not he<br />

directly on the concrete and the ambient air temperature shall increase at a rate not exceeding 5<br />

degrees Celsius per hour until a maximum temperature of 60 degrees Celsius to 70 degrees<br />

Celsius is reached. The maximum temperature shall be maintained until the concrete has<br />

reached the desired strength.<br />

When steam curing is discontinued, the ambient air temperature shall not drop at a rate<br />

exceeding 5 degrees Celsius per hour until a temperature of about 10 degrees Celsius above the<br />

temperature of the air 10 which the concrete will be exposed, has been reached. The concrete<br />

shall not be exposed to temperatures below freezing for at least six days after curing.<br />

1713.3. Curing Compounds<br />

Curing compounds shall only be permuted in special circumstances and will require specific<br />

approval of the Engineer in charge; Curing compounds shall not be used on any surface which<br />

requires further finishing to be applied. All construction joints shall be moist, cured and no curing<br />

compound will be permitted in locations where concrete surfaces are required to be bonded<br />

together.<br />

Curing compounds shall be continuously agitated during use. All concrete cured by this<br />

method shall receive two applications of the curing compound. The first coat shall be applied<br />

immediately after acceptance of concrete finish. If the surface is dry, the concrete shall be<br />

saturated with water and curing compound applied as soon as the surface film of water