7.<br />

Mastic Asphalt<br />

Stability of Mix<br />

Water sensitivity of mix<br />

(Retained tensile strength)<br />

Swell test on the mix<br />

Control of temperature of<br />

binder in boiler, aggregate in<br />

the dryer and mix at the time<br />

of laying and rolling<br />

control of binder content and<br />

grading of the mix<br />

Rate of spread of mixed<br />

material<br />

Density of compacted layer<br />

Quality of binder<br />

Aggregate impact value/los<br />

angeles abrasion value<br />

Flakiness index and<br />

elongation index<br />

Striping value<br />

Water sensitivity of mix<br />

Grading of aggregates<br />

Water absorption of<br />

aggregates<br />

Soundness (Magnesium and<br />

Sodium Sulphate)<br />

Percentage of fractured<br />

faces<br />

Binder content and<br />

aggregate grading<br />

and mixed aggregates<br />

from the dryer of each<br />

400 tonnes of mix<br />

subject to a minimum of<br />

two tests per plan per<br />

day.<br />

For each 400 tonnes of<br />

mix produced a set of 3<br />

Marshall specimens to<br />

be prepared and tested<br />

for stability flow value<br />

density and void content<br />

subject to a minimum of<br />

two sets being tested<br />

per plant per day<br />

Same as mentioned<br />

under serial no.2<br />

As required for the<br />

Bituminous concrete<br />

at regular close intervals<br />

one test for each 400<br />

tonnes of mix subject to<br />

a minimum of two tests<br />

per day plant<br />

Regular control through<br />

check on the weight of<br />

mixed material and layer<br />

thickness<br />

One test per 250m 2<br />

area<br />

same as mentioned<br />

under serial no.1<br />

same as mentioned<br />

under serial no.2<br />

-do-<br />

-do-<br />

-do-<br />

Two tests per day per<br />

plant both on the<br />

individual constituent<br />

and mixed aggregates<br />

from the dryers<br />

Same as in serial No.2<br />

same as mentioned<br />

under serial no.2<br />

same as mentioned<br />

under serial no.2<br />

Periodic subject to<br />

minimum of two tests<br />

per day per plant