<strong>MAN</strong> B&W 2.04<br />

Line 4:<br />

Represents the limit at which an ample air supply<br />

<str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for combusti<strong>on</strong> and imposes a limitati<strong>on</strong><br />

<strong>on</strong> the maximum combinati<strong>on</strong> of torque and<br />

speed.<br />

Line 5:<br />

Represents the maximum mean effective pressure<br />

level (mep), which can be accepted for c<strong>on</strong>tinuous<br />

operati<strong>on</strong>.<br />

Line 6:<br />

Propeller curve, clean hull and calm weather – light<br />

running, used for propeller layout/design.<br />

Line 7:<br />

Represents the maximum power for c<strong>on</strong>tinuous<br />

operati<strong>on</strong>.<br />

Limits for overload operati<strong>on</strong><br />

The overload service range <str<strong>on</strong>g>is</str<strong>on</strong>g> limited as follows:<br />

Line 8:<br />

Represents the overload operati<strong>on</strong> limitati<strong>on</strong>s.<br />

The area between lines 4, 5, 7 and the heavy<br />

dashed line 8 <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for overload running for<br />

limited periods <strong>on</strong>ly (1 hour per 12 hours).<br />

Line 9:<br />

Speed limit at sea trial.<br />

Limits for low load running<br />

As the fuel injecti<strong>on</strong> <str<strong>on</strong>g>is</str<strong>on</strong>g> automatically c<strong>on</strong>trolled<br />

over the entire power range, the engine <str<strong>on</strong>g>is</str<strong>on</strong>g> able to<br />

operate down to around 15% of the nominal L 1<br />

speed.<br />

<strong>MAN</strong> B&W ME/ME-C/ME-B/-GI-TII engines<br />

<strong>MAN</strong> <strong>Diesel</strong><br />

Recommendati<strong>on</strong><br />

Page 3 of 10<br />

C<strong>on</strong>tinuous operati<strong>on</strong> without limitati<strong>on</strong>s <str<strong>on</strong>g>is</str<strong>on</strong>g> allowed<br />

<strong>on</strong>ly within the area limited by lines 4, 5,<br />

7 and 3 of the load diagram, except <strong>on</strong> low load<br />

operati<strong>on</strong> for CP propeller plants menti<strong>on</strong>ed in the<br />

previous <str<strong>on</strong>g>secti<strong>on</strong></str<strong>on</strong>g>.<br />

The area between lines 4 and 1 <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for<br />

operati<strong>on</strong> in shallow waters, heavy weather and<br />

during accelerati<strong>on</strong>, i.e. for n<strong>on</strong>�steady operati<strong>on</strong><br />

without any strict time limitati<strong>on</strong>.<br />

After some time in operati<strong>on</strong>, the ship’s hull and<br />

propeller will be fouled, resulting in heavier running<br />

of the propeller, i.e. the propeller curve will<br />

move to the left from line 6 towards line 2, and<br />

extra power <str<strong>on</strong>g>is</str<strong>on</strong>g> required for propulsi<strong>on</strong> in order to<br />

keep the ship’s speed.<br />

In calm weather c<strong>on</strong>diti<strong>on</strong>s, the extent of heavy<br />

running of the propeller will indicate the need for<br />

cleaning the hull and possibly pol<str<strong>on</strong>g>is</str<strong>on</strong>g>hing the propeller.<br />

Once the specified MCR (and the matching point)<br />

have been chosen, the capacities of the auxiliary<br />

equipment will be adapted to the specified MCR,<br />

and the turbocharger specificati<strong>on</strong> and the compressi<strong>on</strong><br />

ratio will be selected.<br />

If the specified MCR (and the matching point) <str<strong>on</strong>g>is</str<strong>on</strong>g> to<br />

be increased later <strong>on</strong>, th<str<strong>on</strong>g>is</str<strong>on</strong>g> may involve a change<br />

of the pump and cooler capacities, change of the<br />

fuel valve nozzles, adjusting of the cylinder liner<br />

cooling, as well as rematching of the turbocharger<br />

or even a change to a larger size of turbocharger.<br />

In some cases it can also require larger dimensi<strong>on</strong>s<br />

of the piping systems.<br />

It <str<strong>on</strong>g>is</str<strong>on</strong>g> therefore of utmost importance to c<strong>on</strong>sider,<br />

already at the project stage, if the specificati<strong>on</strong><br />

should be prepared for a later power increase.<br />

<str<strong>on</strong>g>Th<str<strong>on</strong>g>is</str<strong>on</strong>g></str<strong>on</strong>g> <str<strong>on</strong>g>is</str<strong>on</strong>g> to be indicated in the Extent of Delivery.<br />