12.07.2015 Views

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>srenewable generation. The NYISO would address changes in ancillary service requirements, ifrequired, to implement 8,000 MW of wind.The addition of 8000 MW wind in 2018 would increase fuel diversity in New York. The windresources would displace fossil-fired generation, which could have a positive benefit to NewYork when considering potential fuel supply vulnerability issues.Region DescriptionThe New York Control Area is a single state ISO (NYISO) formed as the successor to the NewYork Power Pool – a consortium of the eight investor-owned utilities, in 1999. The NYISOmanages the New York State transmission grid encompassing approximately 10,892 miles oftransmission lines over 47,000 square miles and serving the electric needs of 19.2 million NewYorkers. New York experiences its peak load in the summer period, with the current all-timepeak load of 33,939 MW set in 2006. (http://www.nyiso.com).Page 100<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!