12.07.2015 Views

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>sTable ERCOT- 1: MW Tiers for ERCOT CREZ Transmission OptimizationStudy<strong>Scenario</strong> 1(MW)<strong>Scenario</strong> 2(MW)<strong>Scenario</strong> 3(MW)<strong>Scenario</strong> 4(MW)Wind installed asof 4/2/20086,903 6,903 6,903 6,903Incremental CREZ WindPanhandle A 1,422 3,191 4,960 6,660Panhandle B 1,067 2,393 3,270 0McCamey 829 1,859 2,890 3,190Central 1,358 3,047 4,735 5,615Central West 474 1,063 1,651 2,051CREZ WindCapacity5,150 11,553 17,956 17,516Total WindInstalled12,053 18,456 24,859 24,419<strong>Scenario</strong> 2 was selected by the PUCT and the construction of the transmission plan necessary toimplement this scenario has been ordered by the PUCT. Therefore, this transmission plan isincluded in the Long-Term <strong>Reliability</strong> <strong>Assessment</strong> Reference Case. CREZ <strong>Scenario</strong> 3 providesthe basis for this <strong>2009</strong> Long-Term <strong>Reliability</strong> <strong>Assessment</strong> <strong>Scenario</strong> Case. The transmission plandeveloped for <strong>Scenario</strong> 3 includes several new circuits in the Texas panhandle, and a 2,000MWHVdc circuit from west Texas to the Houston area. These circuits are incremental to thetransmission plan included in the Reference Case. The combined transmission plan for <strong>Scenario</strong>3 (including the CREZ lines that are needed for <strong>Scenario</strong> 2 as well as the incremental lines for<strong>Scenario</strong> 3) is depicted in Figure ERCOT-2. The estimated cost of this plan is an incremental$1.45 billion over the plan that is included in the Reference Case, plus any incrementalinterconnection system costs. This plan includes 300 miles of new 345 kV right-of-way and 360miles of new HVdc right-of-way plus the incremental interconnection facilities.<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong> Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!