12.07.2015 Views

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>sTable Québec-3: Renewable Resources Integration <strong>Scenario</strong>PLANNED RESOURCES in MW (1)Call for Tenders - Wind I <strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 2018- St-Ulric - St-Léandre 127.5 150 150 150 150 150 150 150 150 150- Les Méchins 150 150 150 150 150 150 150 150- Mont-Louis 100.5 100.5 100.5 100.5 100.5 100.5 100.5 100.5 100.5- Montagne-Sèche 58.5 58.5 58.5 58.5 58.5 58.5 58.5 58.5- Gros-Morne 1 110.5 110.5 110.5 110.5 110.5 110.5 110.5 110.5- Gros-Morne 2 111 111 111 111 111 111 111Call for Tenders - Wind II <strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 2018- Des Moulins 156 156 156 156 156 156 156 156- St-Rémi 100 100 100 100 100 100 100- St-Valentin 50 50 50 50 50 50 50- De l'Érable 100 100 100 100 100 100 100 100- Massif du Sud 150 150 150 150 150 150 150- Seigneurie de Beaupré 2 132.6 132.6 132.6 132.6 132.6 132.6- Seigneurie de Beaupré 3 139.6 139.6 139.6 139.6 139.6 139.6- Clermont 74 74 74 74- Rivière du Moulin Ph 1 150 150 150 150 150- Rivière du Moulin Ph 2 200 200 200 200- Ste-Luce 68 68 68 68 68 68 68- Lac Alfred Ph 1 150 150 150 150 150 150 150- Lac Alfred Ph 2 150 150 150 150 150 150- New Richmond 66 66 66 66 66 66 66- Le Plateau 138.6 138.6 138.6 138.6 138.6 138.6 138.6 138.6- Aguanish 80 80 80 80 80 80 80 80- MRC la Matépédia 100 100 100 100 100Call for Tenders - Wind III <strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 2018- 2 X 250 MW 100 300 500 500 500 500 500Call for Tenders - Biomass II 125 125 125 125 125 125 125Call for Tenders - Small Hydro 25 50 100 150 150 150 150 150Hydro-Québec Production <strong>2009</strong> 2010 2011 2012 2013 2014 2015 2016 2017 2018- Eastmain-1 A 533 768 768 768 768 768 768 768- La Sarcelle 100 150 150 150 150 150 150 150- La Romaine Complex 622 622 882 1260 1260Private Producers - Small Hydro 35 70 70 70 70 70 70 70 70 70(1): For Wind Power, the In-Service dates are December 1st of the indicated year and for hydro and Biomass Power, the In-Service dates are November 1st of the undicated year.Eastmain-1 A/Sarcelle/Rupert ProjectThe project consists in building a 768 MW generating station – Eastmain-1 A powerhouse – nearthe existing Eastmain-1 powerhouse, and diverting part of the flow of the Rupert River into thesetwo facilities, then through Sarcelle powerhouse and on to Robert-Bourassa (LG-2), La Grande-2-A and La Grande-1 generating stations.The Rupert diversion will involve the following structures and facilities:four dams.a spillway on the Rupert River, which will also function as an instream flow releasestructure.74 dikes.two diversion bays (forebay and tailbay) with a total area of about 346 km 2 at maximumoperating level.a 2.9 km long tunnel between the Rupert forebay and tailbay.a network of canals with a total length of about 12 km to facilitate flow in the variousportions of the diversion bays.Hydraulic structures on the Rupert River to maintain post-diversion water levels alongapproximately 48 percent of the river’s entire length.Page 112<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!