12.07.2015 Views

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>sOperational IssuesWithin the Reference Case, for the summer of <strong>2009</strong>, there is only 39 MW 61 of expected on-peakwind capacity on the New England system, so operational challenges from the integration ofvariable resources are negligible at this time. However, under the <strong>Scenario</strong> Case, 829 MW ofonshore wind capacity and 2,901 MW of offshore wind capacity are assumed commercialized forthe target assessment year 2018. With 3,730 MW of wind resources projected, the anticipatedoperational issues are currently being examined by ISO-NE. Figure New England-5-1 shows amap of planned and operating wind projects in New England.61 As of March <strong>2009</strong>, almost 100 MW of nameplate, utility-scale wind generation projects were on line with in theISO-NE system.Page 82<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!