<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>sRegion DescriptionThe province of Ontario covers an area of 1,000,000 square kilometers (415,000 square miles)with a population of 12 million. The Independent Electricity System Operator (IESO) directs theoperations of the IESO-controlled grid (ICG) and administers the electricity market in Ontario.The ICG experiences its peak demand during the summer, although winter peaks still remainstrong.<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong> Page 105