12.07.2015 Views

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

2009 Scenario Reliability Assessment - NERC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Scenario</strong> <strong>Reliability</strong> Self-<strong>Assessment</strong>sTable SPP-1: Projected Transmission AdditionsTransmission Project Name Voltage Length In-Service Description/Status(kV) (Miles) DatesTuco-Potter 765 97 N/A ConceptualPotter-Hitchland 765 88 N/A ConceptualHitchland-Finney** 765 100 N/A ConceptualL.E.S.-Muskogee** 765 185 N/A ConceptualTuco-L.E.S.** 765 210 N/A ConceptualMooreland-Commanche** 765 54 N/A ConceptualCommanche-Spearville** 765 51.2 N/A ConceptualSpearville-Knoll* ** 765 76 N/A ConceptualL.E.S.-Elk City 765 82.2 N/A ConceptualElk City-Mooreland 765 72 N/A ConceptualHitchland-Mooreland** 765 117 N/A ConceptualFinney-Spearville** 765 66 N/A ConceptualSummit-Swissvale** 765 104 N/A ConceptualSwissvale-Iatan** 765 51 N/A ConceptualKnoll-Summit** 765 98 N/A ConceptualLang-Wolf Creek 345 24 N/A ConceptualCommanche-Wolf Creek** 765 203 N/A ConceptualWolf Creek- Lacygne** 765 57 N/A ConceptualSedalia –Phill 345 54 N/A Conceptual* These projects are included in the Balance Portfolio study, are proposed to be built at 345kV.** These projects are included in the SPP’s Extra High Voltage (EHV) study, and are proposed to be built at 765kV.Along with the transmission lines listed above, several new transformer additions are includedin either the JCSP or Balanced Portfolio:Table SPP-2: Projected Transformer AdditionsTransformer Project Name High SideVoltage(kV)Low SideVoltage(kV)In-ServiceDateDescription/StatusTuco 765 345 N/A ConceptualPotter 765 345 N/A ConceptualHitchland 765 345 N/A ConceptualFinney 765 345 N/A ConceptualMuskogee 765 345 N/A ConceptualL.E.S. 765 345 N/A ConceptualMooreland 765 138 N/A ConceptualCommanche 765 138 N/A ConceptualSpearville 765 230 N/A ConceptualKnoll345 345 230 N/A ConceptualKnoll765 765 345 N/A ConceptualElk City 765 230 N/A ConceptualIatan 765 345 N/A ConceptualSummit 765 345 N/A ConceptualSwissvale 765 345 N/A ConceptualLacygne 765 345 N/A ConceptualWolf Creek 765 345 N/A ConceptualSedalia 345 161 N/A ConceptualPage 146<strong>2009</strong> <strong>Scenario</strong> <strong>Reliability</strong> <strong>Assessment</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!