12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5-1. Summary of Open <strong>GP</strong>-B risks at the end of IOC33 Drag-free control. Bencze Open – Mitigation in work (obs 98 & 110). Mitigationis more on-orbit assessment and parameter tuning.On-going investigation into cause. Develop methodsto improve.35 Double bit errors Perry The following actions will be taken to mitigate andimprove response to MBE's:Colin Perry will lead the closure of the following andwill brief ARB and MD when complete:1. Obtain a complete memory dump of the freshlyrebootedMSS in the ITF, make that available at SU forrapid compairson.2. Expand upon MJ's email of 8 Sept to definesections of MSS memory to functionality, attempt toattach criticality to those sections.3. RTWorks limit checking of double bit diag monitorBC_TlmDiag06. MJ, could we use “set io_directive” towrite x#000000 to that location after clearing thiserror.4. Training of FD, MD personnel in the detection andrepair of this type problem. (Maggie to provide areasof MBE of concern). MD to be immediately notified ofMBE's. (Steve Larsen to look at MBE impact on GSS).Figure 5-5. (part 1 or 3). Open risk items during on-orbit science mission136 March 2007 Chapter 5 — Managing Anomalies and Risk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!