12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16.2.3 Control and communication of spacecraft configurationIssue Summary: Maintain thorough configuration control and communicate changes.Description of the <strong>GP</strong>-B experience:Important documents are maintained on secure web pages for access by all team members. Baselineconfiguration was established and successfully managed.Best Practices:Establish and document program baselines for schedules, databases, timelines and technical information.Thoroughly review all changes and communicate changes as appropriate to team members16.2.4 Effective use of databasesIssue Summary: Make good use of databases for requirement, test tracking and change control.Description of the <strong>GP</strong>-B experience:A Filemaker Pro database was used on <strong>GP</strong>-B for requirements/test tracking, change requests and many otheroperational information uses. This allowed quick cross-referencing of open items, requirements to test caseinformation and many other uses. It was very useful to quickly generate different matrices for trackingpurposes.Best Practices:This type of relational database is very useful for program management and control.16.2.5 Inclusion of operations experts in hardware developmentIssue Summary: Early insertion of operations experience into hardware development positively affects on-orbitoperations.Description of the <strong>GP</strong>-B experience:Early insertion of skilled operations personnel into the hardware development process, notably the ExperimentControl Unit (ECU), allowed the experience of what both procedure and hardware failures looked like, how totell the difference between the two and the best way to recover from them. Experiences during developmentmade functional test development more intuitive. The increased understanding allowed for more coherent testprocedures and simpler code.Best Practices:Apply operations experience into development process for:1. an intuitive set of flight procedures2. experience in recognizing and efficiently resolving anomalies16.2.6 Team member cross-trainingIssue Summary: Team member cross training is effective.<strong>Gravity</strong> <strong>Probe</strong> B — <strong>Post</strong> <strong>Flight</strong> Analysis • Final <strong>Report</strong> March 2007 455

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!