12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 8-2. Block Diagram of CDH communications. Green blocks belong to the CDH subsystemThe CCCA communicates with the rest of the space vehicle via the 1553 bus, while the individual componentsof the CDH communicate via high-speed serial bus.The CDH subsystem provides the following:1. Verification and distribution of commands from the uplink data stream and the CCCA2. Acquisition of data in response to CCCA requests3. Generation of the downlink data stream4. Data management and routing between the CCCA, SSR, <strong>GP</strong>S and Control Gyros5. Receipt and distribution of 10 Hz synchronization6. Watch Dog Timer (WDT) redundancy management8.1.1 PerformanceThe CDH performance on-orbit has been nominal. All components have performed well without exception.8.1.1.1 CCCASee Section 8.5 for an in depth discussion of the CCCA.204 March 2007 Chapter 8 — Other Spacecraft Subsystems Analyses

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!