12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 13-18. ECU heater activity during the first half of the Science PhaseAs we continued through the remainder of the Science phase of the <strong>GP</strong>-B Operations, the activity on the ECUwas used primarily for Charge Control use of the UV Lamps and Heat Pulse Meter Heater tests for a heliumlifetime calculations. In April 2005, we determined that the ECU was contributing noise to the SQUID ReadoutSystem. To mitigate this issue, we kept the ECU turned off throughout the remainder of the Science phase,except for a few hours each week, when we powered-on the unit to check the status of various telemetry values.Figure 13-9 below documents the ECU heater activity from January 2005 through the end of May 2005.<strong>Gravity</strong> <strong>Probe</strong> B — <strong>Post</strong> <strong>Flight</strong> Analysis • Final <strong>Report</strong> March 2007 365

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!