12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

During the last month of IOC, preparing to enter the Science phase of the mission, the ECU heater activityslowed dramatically. During this period, the focus was on Quartz Block Support temperature stabilization usingthe closed loop QBS Temperature control, Charge Control use of the UV Lamps, Helium Flow rate analysisusing the Flow Meter Heater and the health and safety monitoring of temperatures and pressures. Figure 13-17documents the ECU heater activity during this period.Figure 13-17. ECU heater activity during the last month of IOC13.1.6 ECU Heater Activity During the Science PhaseDuring the first six months of the Science (Data Collection) Phase of the mission, we continued with health andsafety monitoring of temperatures and pressures, Quartz Block Support temperature stabilization using theclosed loop Temperature control, and Helium Flow rate analysis using the Flow Meter Heater. During thisperiod, we also performed the first of several Heat Pulse Meter Heater tests to determine the amount of Heliumremaining in the dewar. Figure 13-18 documents the ECU heater activity during this period.364 March 2007 Chapter 13 — Other Payload Subsystems Analyses

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!