Table 2-2. Weekly summary of IOC accomplishments (Continued)Weekly Summary of IOC AccomplishmentsWeek Activities CompletedWeek 3 All 4 gyroscopes digitally suspended for over 1 weekPracticed Low Temperature Bakeout (Reduces residual He gas pressure)Resulted in 0.001-0.010 Hz science gyroscope spinsWeek 4 Flew position drag-free for 1 st time (gyro 1)ATC system used roll stars to roughly align to guide starBegan series of small maneuvers (dwell scans) to locate guide starWeek 5 Completed magnetic flux reduction: all gyroscopes have very low trapped magnetic flux(desirable situation)A second thruster was turned off due to stuck thruster caused indirectly by the magnetic fluxreductionWeek 6 Sent a low flow of spinup gas (2 sccm for 90 seconds duration) to each gyroscopeEach gyro spun to approximately 0.3 HzMicroHz/Hr spindown rates confirm clean gyroscopesWeek 7 Locked onto IM Pegasi with the science telescopeBegan performing science calibration testsSuccessfully demonstrated the ability to discharge the science gyroscopes to spec (15 mV)Week 8 Verified IM Pegasi by visiting two neighboring starsSuccessfully tested the control effort based drag-free system for 1 orbitWeek 9 Increased the spacecraft roll rate from 0.1 to 0.3 rpm allowing mass trimPerformed updates on gyro biases to improve science performanceWeek 10 Increased the spacecraft roll rate from 0.3 to 0.9 rpm (the maximum for the mission) for liquidhelium bubble wrapApplied 120% of science gyro spinup voltages as a stress/health test: all gyroscopes workedperfectlyCompleted practice of science calibrations of gyroscopesWeek 11 Uploaded new ATC software to provide improved drag-free performance with the turned offthrustersRequired turning off the flight computer and rebootingProcedure was perfectly executedWeek 12 Spun the 4 science gyroscopes to approximately 3 HzFull flow rate of spinup gas for 90 secondsReduced roll rate to 0.5 rpmSelected science roll rate to be 0.52 rpmWeek 13 Successfully demonstrated extended drag-free operationFull Speed Spin of Gyro #4 to 106 HzFull Speed Spin of Gyro #2 to 88 HzWeek 14 ATC Filter TuningCoarse Spin Axis Alignment Gyros #2 and #448 March 2007 Chapter 2 — Overview of the <strong>GP</strong>-B Experiment & Mission

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!