12.07.2015 Views

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

GP-B Post-Flight Analysis—Final Report - Gravity Probe B - Stanford ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DateSeverity68 16-Jun-04 Medium Decline in <strong>GP</strong>S lock <strong>GP</strong>S lock time ratiodecreased from a nominal98% to 35% over a few dayperiod, roughly 60 days intomission.69 19-Jun-04 Obs T GSS Cal14 Sequence Gyros 1-4 did not re-centerat conclusion of CalSequence70 24-Jun-04 Obs T Thruster 12 bottomingout during roll-up to 0.6rpm71 27-Jun-04 Obs T Loss of Star Sensor IDs athigher roll rates72 28-Jun-04 Obs F <strong>GP</strong>S First Failure TestActivated73 29-Jun-04 Obs O SSR not in playbackmode during playbackpass74 29-Jun-04 Obs T Roll down is less thanexpectedSubtypeTitle Description Root cause Corrective ActionThruster 12 commandedcompletely closed duringroll-up to 0.6 rpm. Mayreduce ATC dynamic range.At 0.6 and 0.9 rpm, initial staridentifications decreasedresulting in attitude errors<strong>GP</strong>S First Failure TestActivatedSSR not in playback modeduring playback passSV roll down only to 0.7 rpm,0.5 rpm expected.Likely cause: SEU or longperiodsoftwareerror/overrun.Template scheduling error.Thruster pressure sensorbiasMost probable causes are:1) Gyro Bias errors, 2) sensorgate strategy, 3) star attitudecorrection weighting gain.Insufficient time allowed insafemode test for receiver tolock onto <strong>GP</strong>S constellationTemplate schduling error.The excess mass flow wentnegative for substantialportions of the roll downperiod, causing the vehicleto abort the roll downduring those times. Sensedrates on X and Y were largerthan expected.Reboot of unit cleared theproblem; <strong>GP</strong>S continues toperform as expectedfollowing reboot.Schedule templates incorrect order.Adjust pressure sensor biasto eliminate bottom-outRemaining actions: Updateprocedure for re-ID andlock on after possiblefuture loss of stars (in work)Increase first failure testtimeout duration.Shedule templates incorrect order.Command slower roll downrates.534 March 2007 Chapter D — Summary Table of <strong>Flight</strong> Anomalies

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!