23.08.2016 Views

GOHSEP Elected_Officials_Manual_2015

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

inventory must be provided to the Parish OHSEP. A copy<br />

of the combined Parish and municipal inventory must<br />

be submitted to <strong>GOHSEP</strong> biennially.<br />

Evacuation and sheltering plans for at-risk<br />

populations must provide guidance to:<br />

• Identify and ensure the use of all available<br />

means of transportation.<br />

• Notify the at-risk population of a mandatory<br />

evacuation and available transportation.<br />

• Assess an individual’s state and the capacity of<br />

available facilities to provide appropriate and<br />

needed assistance to determine whether the<br />

risk of sheltering in place outweighs the risk<br />

of loss of life if forced to evacuate.<br />

• Coordinate transportation resources with a<br />

shelter destination outside of the impacted area.<br />

• Provide for medical emergencies that may<br />

occur during evacuation.<br />

• Execute the plan within 36 hours of<br />

declaration of a voluntary evacuation and<br />

within 12 hours of a declared mandatory<br />

evacuation.<br />

In addition to the inventory and assessment deadlines<br />

noted previously, the evacuation and sheltering plan<br />

for at-risk populations must also be submitted to<br />

<strong>GOHSEP</strong> biennially on or before December 1 and<br />

every second year thereafter. The plan should include<br />

evacuation and sheltering for essential workers and<br />

address the provisions for food, water and shelter for at<br />

least 72 hours post-landfall of any hurricane.<br />

2.2 Required Plans Page 4 of 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!