In general<br />

„PARK ONE“ is an office building in the centre of Bratislava city. It<br />

consists of four underground and nine upper floors. The structure<br />

is designed as a monolithic reinforced concrete skeleton with slabs<br />

without ribs.<br />

The total height of the project above the ground level is 36 m.<br />

The excavation is surrounded on three sides by the main city<br />

infrastructure, which is separated from the excavation only by a<br />

pedestrian sidewalk. The depth of the excavation was 12 m. The<br />

nailed slope with additional ground anchors secured the walls of<br />

the excavation.<br />

The main raft was located about 2 m below the groundwater level,<br />

therefore the hole was stuffed by bentonite aperture to the impervious<br />

neogenic footwall and the water was drained.<br />

Geological conditions<br />

In the geological content of the building area is quarterar and<br />

neogene soil. The surface layer is created by anthropogenic sediments<br />

with the characteristics of dirt-sand accretions with the rest<br />

of the building process sewage. The sediment discharge is up to<br />

1,50 – 2,0m p.t. Quarterar sediments are represented mostly by a<br />

sand-gravel complex. It is usually dirt-sand gravel with boulders up<br />

to 15 cm. Neogene is represented in a depth of 14m p.t. by relatively<br />

impervious negenic grey-green clay.<br />

Foundation<br />

The optimal solution due to the geological conditions was the<br />

shallow foundation – foundation raft in the gravel level. The raft is<br />

1100 mm thick. The external walls of all of the basements are made<br />

of watertight concrete C30/37 with reinforcement fy=460 Mpa.<br />

Multifunctional Offices Building Park One<br />

„PARK ONE“ is an office building in the centre of Bratislava<br />

city. It consists of four underground and nine upper floors.<br />

The structure is designed as a monolithic reinforced concrete<br />

skeleton with slabs without ribs. The total height of the<br />

project above the ground level is 36 m. The excavation is<br />

surrounded on three sides by the main city infrastructure,<br />

which is separated from the excavation only by a pedestrian<br />

sidewalk. The depth of the excavation was 12 m. The nailed<br />

slope with additional ground anchors secured the walls of<br />

the excavation. The main raft was located about 2 m below<br />

the groundwater level. The facade of the object is fully<br />

vitreous, therefore a belt girder was designed on the circumference<br />

of the roof rafts.<br />

Bearing system<br />

The main bearing system of the building is created from a cast<br />

in place reinforced concrete skeleton with reinforcement walls<br />

around the vertical communication cores. The walls thicknesses<br />

go from 300 mm to 200 mm. The object has 4 basement floors<br />

and 9 upper floors. The construction heights of the basement<br />

floors are 2,7 m and 3,9 m, the construction height of the ground<br />

floor is 4,8 m and the construction heights of the remaining floors<br />

are 3,55 m. The prevalent module step in the longitudinal direction<br />

is 7,5 and in the cross direction 7,5 and 5,1 m. The remaining<br />

bearing constructions are reinforced concrete columns and walls.<br />

The type of the concrete of the columns is C30/37. The horizontal<br />

bearing constructions are monolithic, reinforced concrete and<br />

slabs, designed from a C25/30 concrete in the whole extent. The<br />

thickness of the slabs is 230 mm. In order to secure the slab against<br />

the shearing efforts welded reinforcement are placed around the<br />

columns as a shearing reinforcement. The reinforcement of the<br />

slabs is created by the KARI mesh with additional reinforcement.<br />

The facade of the object is fully vitreous, therefore a belt girder is<br />

designed on the circumference of the roof rafts, so that the roof<br />

deformations were eliminated to a required standard.<br />

Structural calculations<br />

The calculations were realized by the SCIA•ESA PT 5.2 software,<br />

using the finite element method. The whole object was simulated<br />

in the 3D model created by 2D – shell elements, which are used<br />

for approximation of the bracing walls and for slabs. Columns<br />

are approximated by the 1D elements. The loads are calculated<br />

according to the valid Slovak standards. Module Soilin was used to<br />

simulate the footwall.<br />

Multifunctional Offices Building Park One<br />