22.12.2012 Views

VSH Turòa nad Bodvou - Nemetschek Scia

VSH Turòa nad Bodvou - Nemetschek Scia

VSH Turòa nad Bodvou - Nemetschek Scia

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2<br />

CAD Engineering<br />

Witteveen+Bos<br />

Address Leeuwenbrug 8 • 7411 TJ Deventer (NL)<br />

Telephone +31 570 69 79 11<br />

Fax +31 570 69 73 44<br />

Contact Mr ing. A.H. Deekens / Mr O.J. Ouwerkerk<br />

Email info@witteveenbos.nl<br />

Website www.witteveenbos.nl<br />

Witteveen+Bos project specialists<br />

Reliable, professional, innovative and friendly: these are the<br />

four characteristics that qualify Witteveen+Bos, the consulting<br />

engineering company that has been involved with innovative<br />

and high-profile projects in the Netherlands and abroad for<br />

more than sixty years. Witteveen+Bos supplies consulting and<br />

engineering services for projects in the water, infrastructure,<br />

environment and construction sectors. Typically we use a multidisciplinary<br />

approach where specialists from various sectors<br />

work jointly on the solution of complex assignments.<br />

Clients<br />

Our clients are governments, commerce, industry and various<br />

types of joint ventures. We serve them from eight branches in<br />

the Netherlands and five abroad (Indonesia, Kazakhstan, Latvia,<br />

Romania and Serbia). Our 700 employees are all specialists<br />

who are able to deploy all their expertise in their work. For us,<br />

partnership is the keyword. Personal and fundamental development<br />

are also key issues, because our work continually calls for<br />

new knowledge and new responsibilities.<br />

Specialisms<br />

The collaboration between specialists and the pooling of knowledge,<br />

experience and management expertise provides our<br />

clients with substantial added value. To enable us to continue<br />

to guarantee this added value we make substantial investments<br />

in the development of our employees’ expertise. This is the<br />

only way we can realise our ambition: to be at the top of the<br />

market.<br />

High-profile projects<br />

Examples of high-profile projects where Witteveen+Bos has<br />

been involved are the North/South metro line in Amsterdam,<br />

the development of man-made islands for oil and gas winning in<br />

the Caspian Sea, land reclamation in Indonesia, the Amsterdam-<br />

West sewage water purification project, construction of the Delft<br />

railway tunnel, development of systems to allow the passage of<br />

fish alive at pumping-stations, the master plan for the centre of<br />

Amsterdam International Airport, creating space for the River<br />

Used software • Allplan Engineering<br />

projects, various large and diverse contracts in Central and<br />

Eastern Europe and a large number of other projects in the<br />

Netherlands and abroad.<br />

Innovation<br />

Innovation in projects has been one of the most important<br />

foundations of the success of Witteveen+Bos. A few examples<br />

of innovative developments are the social costs and benefits<br />

analysis, ‘Charted Dutch safety levels’, ‘Partners for Roads’, UV<br />

water treatment in Andijk and Berenplaat and the decontamination<br />

of soil at railway yards.<br />

Realisation Geeuwaquaduct Sneek<br />

The structural ‘Geeuw’ project is divided into ten<br />

subway sections, one water cistern, two prefab traffic<br />

viaducts, one railway viaduct and one aqueduct with the<br />

connecting pieces and caps.<br />

The subway will consist of U-shaped concrete troughs<br />

for the two access roads and a closed section with at<br />

least 2.2 m depth of water from the river Geeuw running<br />

over it. Close to the deepest point of the aqueduct, a<br />

rainwater cistern will be constructed. The concrete cellar<br />

will be divided into a wastewater section, from which<br />

the water will be pumped to the sewage system, and a<br />

rainwater section from which the water will be pumped<br />

to the river Geeuw during heavy rain. Both viaducts<br />

over the western access to the aqueduct will consist of<br />

inverted prefab T sections with a cast-in-situ compression<br />

zone.<br />

48 SCIA User Contest 2007 • Category 2 • CAD Engineering<br />

Realisation Geeuwaquaduct Sneek

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!