Project: Covering of cinders’ box - Ugine & ALZ Arcelor Group<br />

Location: Genk, Belgium<br />

Owner: Ugine & ALZ Belgium N.V.<br />

Engineering office: Ingenieursbureau Stendess N.V., Lovendegem,<br />

Belgium<br />

Contractor: Frijns Industrial Group, Netherlands<br />

Total steel weight: ± 400 tons<br />

Building period: middle 2006<br />

Dimensions: height: ± 20 m<br />

Overall length: ± 80 m<br />

Overall width: ± 60 m<br />

Short description of the project<br />

In order to concentrate and evacuate the gasses during the<br />

dumping and storage of the cinders, a building to cover the cinder<br />

boxes had to be designed and built.<br />

The building consists of different hanging boxes, which are separated<br />

by hanging steel sheet walls.<br />

One of the critical restraints in the design was that the amount of<br />

columns had to be minimal and that existing foundations were to<br />

be used. This resulted in a building of ± 80 m by ± 60 m supported<br />

by only 7 main columns and consisting of hanging external and<br />

internal walls.<br />

Use of ESA-Prima Win<br />

Description of technical questions to be solved with<br />

ESA-Prima Win<br />

The challenge in this project was to design a low budget steel<br />

construction taking into account the existing foundations and the<br />

severe restrictions that were to be met such as a minimal number of<br />

columns (7 main columns), maximum free height inside the boxes<br />

and the maximum use of existing steel profiles.<br />

Because of the great amount of braced structures a non-linear<br />

calculation was needed.<br />

Finding the balance between a low cost structure and taking into<br />

account the severe restrictions was a high creative demand in the<br />

static layout and the dimensioning of the structure.<br />

Description of our experience with ESA-Prima Win when realizing<br />

the project.<br />

For this project ESA-Prima Win proved its power to calculate at<br />

highspeed large structures with a great number of elements and a<br />

great number of combinations.<br />

More, ESA-Prima Win proved that even for large structures the nonlinear<br />

calculations could be done in an acceptable way and time.<br />

Used modules:<br />

• Base<br />

• 3D frame<br />

• Non linear calculations<br />

• Steel code check (EC3)<br />

Covering of cinders’ box - Ugine & ALZ Arcelor Group<br />

Covering of cinders’ box<br />

In order to concentrate and evacuate the gasses during the<br />

dumping and storage of the cinders, a building to cover the<br />

cinder boxes had to be designed and built.<br />

The building consists of different hanging boxes, which are<br />

separated by hanging steel sheet walls.<br />

One of the critical restraints in the design was that the<br />

amount of columns had to be minimal and that existing<br />

foundations were to be used. This resulted in a building of<br />

± 80 m by ± 60 m supported by only 7 main columns and<br />

consisting of hanging external and internal walls.<br />