numbered, ancl their location noted on the mine<br />

map. They connect with the mine office ancl<br />

power house, so that in case of a break-down or<br />

accident along the road, the position of the trip<br />

can be reported immediately.<br />

The power plant and surface buildings include<br />

a machine shop 36 x 100 feet, a foundry 20 x 24<br />

feet, and wood working shop IS x 60 feet. All<br />

these buildings are of steel frame and Hy-Rib<br />

construction, on concrete foundations. The powei<br />

house contains two compartments, a boiler room<br />

45 x 77 feet, and engine room 32 x 56 feet. Steam<br />

power is supplied by two batteries of two 150<br />

H. P., return tubular boilers, or 600 H. P. altogether.<br />

There is room for an additional battery.<br />

to be installed when required.<br />

Steam is generated at 125 pounds gauge pressure,<br />

the fuel being slack <strong>coal</strong>, delivered by the<br />

flight conveyor described above, in front of the<br />

boilers on the boiler room floor. Hand firing<br />

will be replaced later by under-feed stokers, for<br />

which arrangements<br />

have been made for<br />

installation when additional<br />

boilers are<br />

needed.<br />

It is planned to install<br />

a scraper conveyor<br />

to remove fhe<br />

ashes from the ashpit<br />

beneath the boilers.<br />

The pump rocm<br />

and condenser room<br />

are underneath the<br />

boiler and engine<br />

room floors, respectively,<br />

the feed<br />

pumps, water supply<br />

pumps for the railroad tanks and feed-water heaters,<br />

and a modern condensing outfit, including a<br />

new condenser, to care for an additional turboalternator.<br />

Three-phase alternating current at 2,400 volts,<br />

60 cycles, is furnished by a 500 K. W. turbo-alternator,<br />

and direct current for the mine locomotives<br />

is furnished by a 200 K. W. synchronous motor<br />

generator set. An additional 500 K. W. turboalternator<br />

is now being installed.<br />

THE COAL TRADE BULLETIN. 53<br />

engine room to a point above the tipple in two<br />

separate circuits, one circuit connected to the fan<br />

motor, running at Mine No. 1 drift, and the other<br />

main circuit extending through to a sub-station<br />

at the No. 2 mine. This circuit furnishes current<br />

for the tipple motor at 220 volts AC; the<br />

fan at No. 2 mine, and a sub-station about 16 feet<br />

square, at No. 2 mine, containing a 200 K. W.<br />

generator set, the necessary switchboard, etc., for<br />

converting the current to D. C. at 275 volts, for<br />

use on the mining machines and locomotives. The<br />

transmission line is carried on poles 30 feet above<br />

the ground, the poles being of a very substantial<br />

character. A No. 6 copper static wire is carried<br />

on top of the poles ancl grounded at intervals to<br />

act as a lightning arrester, in addition to the<br />

regular arresters.<br />

The motor generator set in the sub-station at<br />

No. 2 mine is connected in parallel with a set in<br />

the main power plant through the trolley wires.<br />

These two units furnish power for both mines so<br />

Entrance to drifts at Xo. 'J mine: Fan in center.<br />

that each helps the other to supply the varying<br />

demand for power in either mine or on the trolley<br />

line, as current is needed. Grooved wire is used<br />

for all entries and haulage ways, and the rails are<br />

bonded with 00 flexible compression bonds, and<br />

cross-bonded every 200 feet.<br />

The machine shop, foundry and wood-working<br />

shop are very completely equipped for a plant ol<br />

this character, and enable all ordinary and many<br />

unusual repairs, including the winding of arma­<br />

A Sullivan Class "W.l" 248-foot air compressor. tures, to be clone at the mine. Space will not per­<br />

size 12 x T*:2 x 10 inches, is also being installed, mit a more extended description of this part of<br />

to be driven by a belt from a 50 H. P. AC motor the equipment.<br />

of 2,200 volts. This compressor will furnish air Water is pumped from the Allegheny river by<br />

for the many purposes for which air is required condenser turbine pumps through the condensers,<br />

in the engine room, machine shop, wood shop and and is discharged into the hot well. From that<br />

foundry, and will also be piped up the hill to the point it is pumped by direct lift pumps to the rail­<br />

tipple and motor barn, for use on air brakes on road water tank, from which it runs by gravity<br />

the weigh baskets, and for cleaning motors, etc. to the feed water heaters and boiler feed pumps.<br />

The alternating current is transmitted from the These are equipped with special governors, which