WHC-SD-W100-TI-003 Rev. 0<br />

Waste Form Qualification Testing<br />

Statement of Work W-277587<br />

May 14, 1992<br />

be one liter. The process shall be monitored for the parameters listed in<br />

Table 2 during the preparation of the qualification specimens.<br />

The specimens shall be tested to determine the final waste form properties as<br />

listed in Table 3. <strong>Document</strong>ation supporting laboratory qualification to<br />

perform the required testing shall be included with the work plan. The vendor<br />

shall propose additional process parameters or waste form properties to be<br />

monitored or tested, as may be necessary or desirable to fully define the<br />

pr-ocessor_demonstrate_superior waste-form qualities.<br />

5.0 ACCEPTANCE CRITERIA<br />

Waste form testing acceptance criteria are shown in Table 3. Polymer waste<br />

forms which do not meet all of the test acceptance criteria will not be<br />

considered for further evaluation or for use in the WRAP 2A facility.<br />

6.0 CONCEPTUAL DESIGN SUPPORT<br />

The contractor shall provide support to WHC during the development of the<br />

conceptual design report (CDR) for the WRAP 2A facility. The contractor's<br />

technical staff shall be available for occasional telephone consultation as<br />

required to answer questions regarding the conceptual design. Support shall<br />

include providing process design parameters, recommendations for process<br />

equipment selection, and review of the immobilization process conceptual<br />

design documents. This design review will include a 2-day meeting at UE&C's<br />

offices in Denver. The contractor shall prepare and submit a summary letter<br />

report describing the conclusions and recommendations resulting from this<br />

design review.<br />

7.0 TEST PROCEDURE<br />

The work plan shall include complete detailed descriptions of all proposed<br />

processing equipment and laboratory apparatus to be used for preparation and<br />

testing of the qualification specimens. Laboratory testing procedures to be<br />

used shall conform with the methods shown in Table 3. The tests shall be<br />

performed by laboratories which are qualified in the required test methods.<br />

Laboratory qualification shall be demonstrated by an established QA/QC program<br />

and- pr-ior- experi ence i-n- the- test- methods 3peci#ied. - An,- de.i ati on #rom the<br />

test procedures listed in Table 3 must be approved in writing by WHC prior. to<br />

performing the tests.<br />

8.0 SAFETY<br />

The contractor shall comply with all applicable safety regulations during the<br />

performance of the work. Any unusual safety hazards, such as flammability,<br />

chemical toxicity, or reactivity associated with the process technology shall<br />

be described in the work plan, along with the procedures and equipment which<br />

A-5