- Page 1 and 2:
LEADING PRACTICE SUSTAINABLE DEVELO
- Page 3 and 4:
Disclaimer This publication has bee
- Page 5 and 6:
3.0 DEVELOPMENT AND CONSTRUCTION 61
- Page 7 and 8:
ACKNOWLEDGEMENTS The Leading Practi
- Page 9 and 10:
viii LEADING PRACTICE SUSTAINABLE D
- Page 12 and 13:
1.0 INTRODUCTION The Purpose and La
- Page 14 and 15:
Airborne Contaminants, Noise and Vi
- Page 16 and 17:
Water Management (LP Water) This ha
- Page 18 and 19:
Site water team Corporate managemen
- Page 20 and 21:
Sustainable Mining There is no one
- Page 22 and 23:
Mining the resource efficiently. Th
- Page 24 and 25:
Efficiency SUSTAINABLE MINING PRACT
- Page 26 and 27:
LOCATION: Vilabouly District, Savan
- Page 28 and 29:
Leading Practice The handbooks in t
- Page 30 and 31:
2.0 PRE-DEVELOPMENT: MINERAL EXPLOR
- Page 32 and 33:
The application of high standard en
- Page 34 and 35:
The Business Case for Sustainabilit
- Page 36 and 37:
The information obtained from these
- Page 38 and 39:
conditions are appropriate. In NSW,
- Page 40 and 41:
Such richness also brings challenge
- Page 42 and 43:
The dunefields of Shelburne Bay had
- Page 44 and 45:
Community Engagement in the Early S
- Page 46 and 47:
Baseline studies and social impact
- Page 48 and 49:
Upon completion of the study, resea
- Page 50 and 51:
The scenarios envisaged for the Wat
- Page 52 and 53:
2. Reflections on the significance
- Page 54 and 55:
Engaging with Indigenous communitie
- Page 56 and 57:
Figure 2.9 - A New Township under C
- Page 58 and 59:
Geochemical assessment aims to iden
- Page 60 and 61:
Regardless of the project phase (ex
- Page 62 and 63:
Evaluating Performance: Monitoring
- Page 64 and 65:
For these reasons, it is important
- Page 66 and 67:
Risk Management and Exploration Exp
- Page 68 and 69:
Post-mining & closure Resource deve
- Page 70:
level of family diversity was maint
- Page 73 and 74:
Introduction The development and co
- Page 75 and 76:
MINE: Mt Todd LOCATION: Near Kather
- Page 77 and 78:
Airborne Contaminants, Noise and Vi
- Page 79 and 80:
Biodiversity Management During Deve
- Page 81 and 82:
Rather than taking a generic approa
- Page 83 and 84:
Step 2: Working in collaboration On
- Page 85 and 86:
course was designed to train and pr
- Page 87 and 88:
Adjustments for changes in the mine
- Page 89 and 90:
indicators of high importance durin
- Page 91 and 92:
Operating major mining projects pre
- Page 93 and 94:
the earliest stage of development,
- Page 95 and 96:
Watercourse diversions In order to
- Page 97 and 98:
Figure 3.7 - Morwell River after di
- Page 99 and 100:
tailings disposal techniques contin
- Page 101 and 102:
Figure 4.2 - Predicted blast overpr
- Page 103 and 104:
Responsible management of biodivers
- Page 105 and 106:
Leading practice management of wate
- Page 107 and 108:
MINE: Pierina Mine LOCATION: Distri
- Page 109 and 110:
Weipa - a sustainable approach to t
- Page 111 and 112:
Adopting the International Cyanide
- Page 113 and 114:
Box 1: Major recent incidents invol
- Page 115 and 116:
MINE: Chatree gold mine LOCATION: P
- Page 117 and 118: The audit outcomes also highlight t
- Page 119 and 120: Mercury for gold recovery in small/
- Page 121 and 122: Figure 4.9 - Geological control to
- Page 123 and 124: highest rating group for the whole
- Page 125 and 126: Figure 4.13 - Beverley uranium mine
- Page 127 and 128: from 2.5 - 3.0 tonnes/man-shift to
- Page 129 and 130: Figure 4.17 - Sunrise Dam TSF Taili
- Page 131 and 132: Dry stacking bauxite residue is now
- Page 133 and 134: Once the water is used underground
- Page 135 and 136: The Rio Tinto “Excellence in Wate
- Page 137 and 138: Background Image: Sourced from GOOG
- Page 139 and 140: Company policies and government reg
- Page 142 and 143: 5.0 MINE REHABILITATION AND CLOSURE
- Page 144 and 145: Closure involves the implementation
- Page 146 and 147: Biodiversity and Closure Introducti
- Page 148 and 149: e better than the high standard bei
- Page 150 and 151: Figure 5.7 - Pasture and shelter tr
- Page 152 and 153: The Argyle Diamonds case study (see
- Page 154 and 155: support and on site accommodation a
- Page 156 and 157: Having the right information to mak
- Page 158 and 159: Figure 5.13 - Misima after rehabili
- Page 160 and 161: In January 2011, the PNG government
- Page 162 and 163: MINE: Former lignite mines LOCATION
- Page 164 and 165: Fig 5.16: Former Minister Stein Coa
- Page 166 and 167: Figure 5.19 - Rehabilitated mine si
- Page 170 and 171: Final Rehabilitation Rehabilitation
- Page 172 and 173: Figure 5.23: Aerial view of Area 4
- Page 174 and 175: Landform construction In general, e
- Page 176 and 177: The Hsin-Chen Shan quarry terrain i
- Page 178 and 179: Figure 5.29 - Spreading topsoil at
- Page 180 and 181: Risk Management Risk at closure and
- Page 182 and 183: During the 1980s and 1990s, a numbe
- Page 184 and 185: An example of direct vegetation is
- Page 186: Water Management Central to a mine
- Page 189 and 190: Department of Resources, Energy and
- Page 192 and 193: GLOSSARY AND ACRONYMS Abandoned min
- Page 194 and 195: Biodiversity offsets Conservation a
- Page 196 and 197: Cultural heritage Cultural heritage
- Page 198 and 199: Engagement At its simplest, engagem
- Page 200 and 201: High rate thickener A thickener thr
- Page 202 and 203: NAPP Net Acid Producing Potential,
- Page 204 and 205: Product stewardship This is perhaps
- Page 206 and 207: Risk management process The risk ma
- Page 208 and 209: Sustainable development Sustainable