29.01.2013 Views

A guide to leading practice sustainable development in mining

A guide to leading practice sustainable development in mining

A guide to leading practice sustainable development in mining

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MINE: Mt Todd<br />

LOCATION: Near Kather<strong>in</strong>e, Northern Terri<strong>to</strong>ry, Australia<br />

BRIEF DESCRIPTION: Open pit gold m<strong>in</strong>e<br />

AREA OF LEADING PRACTICE: Acid Rock Dra<strong>in</strong>age; Waste rock dump; TSF;<br />

Biodiversity; Resource efficiency; M<strong>in</strong>e closure<br />

HANDBOOK(S) REFERENCE: Acid M<strong>in</strong>e Dra<strong>in</strong>age; M<strong>in</strong>e Rehabilitation; M<strong>in</strong>e Closure<br />

DESCRIPTION OF OPERATION:<br />

Resource utilisation/efficiency:<br />

This is a classic case of what can go wrong technically did go wrong. The<br />

resource was not utilised optimally.<br />

Head grade<br />

Metallurgy – harder ore than expected; flotation problems;<br />

OHS – dust hazard<br />

A summary of the technical statistics is provided below (Rudenno, 1999)<br />

MT TODD GOLD PROJECT, NORTHERN TERRITORY<br />

Owner, Pegasus Gold Inc.<br />

Close down, November, 1997<br />

Write offs<br />

Acquisition costs US$ 122.6 million<br />

Deferred preproduction and <strong>development</strong> costs US$ 49.4 million<br />

Property and equipment US$ 181.3 million<br />

Total write off. US$ 353.5 million<br />

TECHNICAL DATA FORECAST ACTUAL CHANGE<br />

Reserves 94.5Mt - -<br />

Reserves grade 1.07g/tAu 0.96g/tAu -10%<br />

Met. Recovery 84% 74% -12%<br />

Tonnes/year 8Mt 6.7Mt -16%<br />

Crush<strong>in</strong>g costs $1.36/t $2.49/t +83%<br />

Contract m<strong>in</strong><strong>in</strong>g $1.00/t $1.15/t +15%<br />

Power costs $0.058/kwh $0.075/kwh +29%<br />

Cyanide usage 0.68kg/t 0.86kg/t +26%<br />

Total cash costs 11.86/t $13.58/t +15%<br />

Tonnes ore/oz. Au recov. 34.6 43.8 +27%<br />

Exchange rate A$1.00=US$ 0.7 0.74 +6%<br />

Cash costs/oz Au recov. US$287 US$440 +53%<br />

Gold price/oz US$385 US$315 -18%<br />

64 LEADING PRACTICE SUSTAINABLE DEVELOPMENT PROGRAM FOR THE MINING INDUSTRY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!