29.01.2013 Views

A guide to leading practice sustainable development in mining

A guide to leading practice sustainable development in mining

A guide to leading practice sustainable development in mining

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Management<br />

Central <strong>to</strong> a m<strong>in</strong>e closure plan is the <strong>development</strong> of a progressive rehabilitation plan<br />

which ensures:<br />

the post-m<strong>in</strong>ed landscape is safe and is stable from<br />

physical, geochemical and ecological perspectives.<br />

the agreed <strong>susta<strong>in</strong>able</strong> post-m<strong>in</strong><strong>in</strong>g land use is established and clearly<br />

def<strong>in</strong>ed <strong>to</strong> the satisfaction of the community and government.<br />

success criteria are agreed with relevant stakeholders,<br />

moni<strong>to</strong>red and reported <strong>to</strong> stakeholders.<br />

the quality of the surround<strong>in</strong>g water resources is protected<br />

Dur<strong>in</strong>g the closure process of the New Wallsend coal m<strong>in</strong>e near Newcastle, NSW, one<br />

of the major technical challenges requir<strong>in</strong>g the application of <strong>in</strong>novative techniques<br />

<strong>in</strong>clud<strong>in</strong>g the re-establishment of a 500-metre section of Maryland Creek. The creek<br />

was orig<strong>in</strong>ally piped through the site for the purpose of provid<strong>in</strong>g for additional<br />

coal s<strong>to</strong>ckpil<strong>in</strong>g facilities. The project represented a change <strong>to</strong> the traditional creek<br />

construction/diversion works widely used by the m<strong>in</strong><strong>in</strong>g <strong>in</strong>dustry. The design was<br />

developed <strong>in</strong> consultation with relevant regula<strong>to</strong>ry and relies on the replication<br />

of natural processes <strong>to</strong> ensure long-term stability. To date, it has been found that<br />

the riparian vegetation has become self-regenerat<strong>in</strong>g and negligible care and<br />

ma<strong>in</strong>tenance works (erosion repair) has been post closure (see LP Water p.76).<br />

Figure 5.38 – Re-establishment of Maryland Creek, New Wallsend m<strong>in</strong>e<br />

A GUIDE TO LEADING PRACTICE SUSTAINABLE DEVELOPMENT IN MINING 175

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!