10.02.2013 Views

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

300<br />

door<br />

360<br />

480<br />

– The section of the duct holding the humidification unit must be<br />

equipped with a sloping tub having drains before and after the<br />

post-evaporation unit (pass-through tub), or with a drain before<br />

the separation as well as drains before and after the post-evaporation<br />

unit (separated tubs). Each drain must be connected separately<br />

to the waste water system via a siphon. For hygienic reasons<br />

connect the drain pipes with an open outlet to the waste water<br />

system of the building.<br />

Note: The effective height of the siphon drain depends on the duct<br />

pressure. Correct dimensioning of the siphon drain is the customer’s<br />

responsibility.<br />

Version 1 (optimal) Version 2 (installation length optimized)<br />

Side view Side view<br />

1200 500<br />

Top view<br />

1210<br />

door<br />

min. 130<br />

min 400<br />

+ +<br />

+<br />

Heater<br />

slope min. 1°<br />

to center drain<br />

100<br />

70<br />

1200<br />

slope min. 1°<br />

to center drain<br />

Heater<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!