Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
Condair Dual 2 manual.pdf
- TAGS
- condair
- dual
- biossol.gr
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
300<br />
door<br />
360<br />
480<br />
– The section of the duct holding the humidification unit must be<br />
equipped with a sloping tub having drains before and after the<br />
post-evaporation unit (pass-through tub), or with a drain before<br />
the separation as well as drains before and after the post-evaporation<br />
unit (separated tubs). Each drain must be connected separately<br />
to the waste water system via a siphon. For hygienic reasons<br />
connect the drain pipes with an open outlet to the waste water<br />
system of the building.<br />
Note: The effective height of the siphon drain depends on the duct<br />
pressure. Correct dimensioning of the siphon drain is the customer’s<br />
responsibility.<br />
Version 1 (optimal) Version 2 (installation length optimized)<br />
Side view Side view<br />
1200 500<br />
Top view<br />
1210<br />
door<br />
min. 130<br />
min 400<br />
+ +<br />
+<br />
Heater<br />
slope min. 1°<br />
to center drain<br />
100<br />
70<br />
1200<br />
slope min. 1°<br />
to center drain<br />
Heater<br />
15