10.02.2013 Views

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.4 Replacement of silver ionization “Hygieneplus”<br />

Ag electrode<br />

change due<br />

Ag electrode<br />

change due<br />

error 12<br />

Ag ion<br />

On commissioning, the current of the silver ionization must be adjusted by<br />

the technician in accordance with the table in chapter 9.4. Following the<br />

results of a germ test the settings may be changed at any time later on.<br />

If the silver ionization cartridge needs to be replaced (capacity counter<br />

reads 0) the display alternately shows the standard operation mode display<br />

and the opposite message. In case the control unit is equipped with the<br />

optional remote operation and fault indication PCB, the latter additionally<br />

issues an error. In this case it is mandatory to replace the silver<br />

ionization cartridge with a new one.<br />

If you do not reset the message “Ag electrode change due” (see below), the<br />

unit is automatically powered off after about one week of operation and the<br />

display alternately shows the two opposite messages (also refer to chapter<br />

7.1 “Error messages”).<br />

Resetting the capacity counter<br />

Following the replacement of the silver ionization cartridge the capacity<br />

counter needs to be reset as follows:<br />

Press and hold both arrow keys key while switching the control unit<br />

on. Keep both arrow keys depressed (approx. 5 seconds) until the red<br />

error LED goes off and then comes on again briefly (approx. 1 second).<br />

Replacing the silver ionization cartridge<br />

• Set the hybrid humidifier <strong>Condair</strong> <strong>Dual</strong> out of operation as per chapter<br />

5.3 and depressurize the water system.<br />

• Remove the two electrical connectors from the connections on the silver<br />

ionization cartridge.<br />

• Loosen the hose connectors at the entry and the exit, then remove both<br />

screw-in nipples.<br />

Caution! The silver ionization cartridge is filled with fully demineralized<br />

water. Place a bucket under the cartridge before loosening the connections.<br />

• Undo the four screws fastening the silver ionization cartridge to the<br />

holder, then remove the cartridge.<br />

Caution! The empty silver ionization cartridge weighs approx. 3 kg<br />

(6.5 lb).<br />

• Install the new silver ionization cartridge in the reverse order.<br />

Caution! Exhausted silver ionization cartridges must be sent to the local<br />

<strong>Condair</strong> representative for correct disposal.<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!