24<br />

Mounting and alignment of the vertical sections:<br />

11<br />

Drain-off<br />

sheet left<br />

50mm<br />

Drain-off sheet with system-specific<br />

width (marked with a ”V”)<br />

V<br />

Use the brackets for the upper flow sheets as<br />

spacers (the bracket with system-specific width is<br />

marked with a “V”)<br />

V<br />

Drain-off sheet right<br />

11. Use the clamping brackets to fix all vertical sections to the cross arms<br />

and temporarily align them according to the installation drawing provided.<br />

Note: Tighten the clamping brackets only to a point at which the vertical<br />

sections can still be moved.<br />

Important! The openings of the sections to the very left and right must<br />

face the duct wall.<br />

Push the vertical section to the very left towards the duct roof until it<br />

comes to a stop, then align it at a distance of 50 mm parallel to the duct<br />

wall. Finally, fasten the screws of the respective clamping brackets.<br />

50mm<br />

Hang all drain off sheets into the vertical sections and push them down<br />

to the very stop.<br />

Important! The drain-off sheet with system-specific width (marked with<br />

a “V”) must be mounted in the corresponding interstice (see installation<br />

drawing provided).