10.02.2013 Views

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

30<br />

20<br />

20. Insert in the lower flow sheet between the ceramic plate and the two<br />

vertical sections (this step must be carried out only for the lowest<br />

ceramic element of a vertical row).<br />

Important! Between the vertical sections with system-specific distance<br />

the specially marked lower flow sheet must be mounted.<br />

21<br />

Air flow direction<br />

Duct, top view<br />

21. Only the rear rows of ceramic plates require the installation of<br />

anti-drip sheets. However, the anti-drip sheets must be installed<br />

only on the sides of the ceramic plates which overlap with the<br />

plates of a front row (see figure above). The ceramic plates at the<br />

very bottom require the installation of plate sealings instead of<br />

anti-drip sheets.<br />

Insert the anti-drip sheet on the corresponding side between the<br />

vertical section and the overlapping ceramic plate until it comes to a<br />

stop. Then, bend the free end of the anti-drip sheet downwards so that<br />

it forms a curve and touches the lower ceramic plate.<br />

anti-drip sheet

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!