10.02.2013 Views

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

Condair Dual 2 manual.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 Operation<br />

5.1 Introduction<br />

8<br />

I/O<br />

5.2 Commissioning for daily operation<br />

test<br />

The <strong>Condair</strong> <strong>Dual</strong> Hybrid Humidifier must be commissioned and operated<br />

only by personnel familiar with the unit and adequately qualified<br />

for the task. Ascertaining the qualification is the customer’s responsibility.<br />

The <strong>Condair</strong> <strong>Dual</strong> Hybrid Humidifier is operated via the control unit. The<br />

control unit provides the following display and control elements:<br />

1<br />

XXXXXXXXXXXXXXXX<br />

XXXXXXXXXXXXXXXX<br />

M E<br />

6<br />

2 3 4 5 7<br />

1 Display<br />

(5x7 dot matrix, 2x16 characters)<br />

2 key (menu key)<br />

3 key (arrow key up)<br />

4 key (arrow key down)<br />

5 key (entry key)<br />

6 “Error” indicator (red LED)<br />

7 “Humidification on” indicator<br />

(green LED)<br />

8 key (power switch)<br />

The following description outlines the commissioning procedure for daily<br />

operation. It is assumed that first-time commissioning has been carried out<br />

properly by the service technician of your <strong>Condair</strong> supplier. Proceed as<br />

follows to prepare the <strong>Condair</strong> <strong>Dual</strong> Hybrid Humidifier for operation:<br />

• Check the installation and all system components for damage.<br />

Caution! Do not put the system into operation in case of damaged<br />

installations or system components.<br />

• Make sure the ceramic plates are correctly located and properly sealed.<br />

Caution! Put the system into operation only if the above requirements<br />

are met without fail.<br />

• Set the mains supply service switch (power supply to control unit) to<br />

“On”.<br />

• First set the power switch of the control unit to “I”, then open the shutoff<br />

valve of the water supply conduit. The control system now carries<br />

out a basic system test while the “Humidification on” and “Error”<br />

indicators light up. Once the test is completed the drain valve opens for<br />

approximately 20 seconds (flushing of the permeate conduit).<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!